![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_28125.2 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 280aa MW: 31279.4 Da PI: 4.4739 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 31.3 | 3.6e-10 | 104 | 146 | 8 | 55 |
HHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 8 rErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
Er+RR r+++++ Lr+l+P+ +K++Ka+i+ Av Y+ +Lq
evm.TU.contig_28125.2 104 SERKRRGRMKEKLYALRSLVPNI-----TKMDKASIVGDAVLYVEDLQ 146
6*********************7.....7*****************98 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 14.634 | 96 | 145 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 7.9E-16 | 98 | 163 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 3.53E-15 | 98 | 170 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 2.02E-11 | 98 | 148 | No hit | No description |
| SMART | SM00353 | 5.6E-12 | 102 | 151 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 1.0E-7 | 104 | 146 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0034756 | Biological Process | regulation of iron ion transport | ||||
| GO:0071281 | Biological Process | cellular response to iron ion | ||||
| GO:0071369 | Biological Process | cellular response to ethylene stimulus | ||||
| GO:0071732 | Biological Process | cellular response to nitric oxide | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 280 aa Download sequence Send to blast |
MDSLQINEYE LHDFLDDPNF DQFINLIRGE DEEPVGDGNV GTCFLDPPPA QIDFDFNIVG 60 DTLVPSAGVV SGLDAPEEED DSSTTINVVA ARKTRMDRSR TLVSERKRRG RMKEKLYALR 120 SLVPNITKMD KASIVGDAVL YVEDLQMQAK KLKADIANLE ASLAGCHQST ESKDNNVKFA 180 AYDKPPTKRI KQMDVFQVEV SEFYVRLVCQ RGEGIAASLY KALESLTTFC IRNSNLVTVD 240 DTFILTFTIN VINCEQSLNL PNLKLWVTGA LINQEFDFH* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor. Essential protein involved in iron uptake responses. Regulates FRO2 at the level of mRNA accumulation and IRT1 at the level of protein accumulation. Confers enhanced iron mobilization responses at low iron supply. {ECO:0000269|PubMed:15539473, ECO:0000269|PubMed:15556641, ECO:0000269|PubMed:16117851}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_28125.2 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: In roots by iron deficiency. Repressed by cytokinins. Induced by cold, UV, ethylene (ACC), jasmonic acid (JA), flagellin, and salicylic acid (SA) treatments. {ECO:0000269|PubMed:12679534, ECO:0000269|PubMed:15531708, ECO:0000269|PubMed:15539473, ECO:0000269|PubMed:15556641, ECO:0000269|PubMed:18397377}. | |||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021911858.1 | 0.0 | transcription factor FER-LIKE IRON DEFICIENCY-INDUCED TRANSCRIPTION FACTOR | ||||
| Swissprot | Q0V7X4 | 7e-99 | FIT_ARATH; Transcription factor FER-LIKE IRON DEFICIENCY-INDUCED TRANSCRIPTION FACTOR | ||||
| TrEMBL | C0SV65 | 2e-96 | C0SV65_ARATH; Uncharacterized protein At2g28160 (Fragment) | ||||
| STRING | evm.TU.contig_28125.2 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4187 | 28 | 57 | Representative plant | OGRP7271 | 11 | 18 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G28160.1 | 1e-101 | FER-like regulator of iron uptake | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_28125.2 |




