![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_30708.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 429aa MW: 45304.3 Da PI: 6.5065 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 37.1 | 5.8e-12 | 218 | 263 | 5 | 55 |
HHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 5 hnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
h+++Er RR+ri +++ L+el+P+a K +Ka++L + ++Y+k Lq
evm.TU.contig_30708.1 218 HSIAERLRRERIAERMKALQELVPNA-----NKTDKASMLDEIIDYVKFLQ 263
99***********************8.....6******************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| CDD | cd00083 | 2.83E-13 | 211 | 267 | No hit | No description |
| SuperFamily | SSF47459 | 4.97E-17 | 211 | 273 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| PROSITE profile | PS50888 | 17.39 | 213 | 262 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 1.8E-16 | 215 | 272 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 2.8E-9 | 218 | 263 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 1.5E-13 | 219 | 268 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0048767 | Biological Process | root hair elongation | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 429 aa Download sequence Send to blast |
MQPCSREMQA MNSLLNQSHQ IPLQEQQQQQ QQQQQQHSQI QNPQFDSSSH DDFLEQMLST 60 LPSCSWGSDP ATALKSSPWV DEPAPSDFHA AHFSDESAIL ASKLRQHQIS GGSPAAAAAA 120 AAKMMMQHHQ QIMMMPLSLG AESHQNDVVD GSSSSSFKSP SNHQGGPMQQ AQNFGAPSAV 180 MNQTQPQIQP QASGSTGGAS AQPRQRVRAR RGQATDPHSI AERLRRERIA ERMKALQELV 240 PNANKTDKAS MLDEIIDYVK FLQLQVKVLS MSRLGGAAAV APLVADLSSE GGGDCIQGNG 300 NGNGNGNGGT HARNNTASSN DSLTVTEHQV AKLMEEDMGS AMQYLQGKGL CLMPISLATA 360 ISTATCHSRG PMINNAAVPT NNNNPLLQSN GEGPSSPSMS VLTVQSATVG NGGTEPSSVK 420 DAASVSKP* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 222 | 227 | RLRRER |
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00659 | PBM | Transfer from Pp3c14_15890 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_30708.1 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: By cold, UV, ethylene (ACC), flagellin, jasmonic acid (JA), and salicylic acid (SA) treatments. {ECO:0000269|PubMed:12679534}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | - | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021911649.1 | 0.0 | transcription factor bHLH66-like | ||||
| Swissprot | Q9ZUG9 | 1e-95 | BH066_ARATH; Transcription factor bHLH66 | ||||
| TrEMBL | A0A061GR23 | 0.0 | A0A061GR23_THECC; LJRHL1-like 1 | ||||
| STRING | evm.TU.contig_30708.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM3042 | 27 | 63 | Representative plant | OGRP58 | 16 | 313 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G24260.1 | 3e-69 | LJRHL1-like 1 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_30708.1 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




