![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_30908.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | M-type_MADS | ||||||||
| Protein Properties | Length: 233aa MW: 26192.2 Da PI: 10.7249 | ||||||||
| Description | M-type_MADS family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | SRF-TF | 73.4 | 1.9e-23 | 16 | 62 | 3 | 49 |
--SHHHHHHHHHHHHHHHHHHHHHHHHHHT-EEEEEEE-TTSEEEEE CS
SRF-TF 3 ienksnrqvtfskRrngilKKAeELSvLCdaevaviifsstgklyey 49
+n+sn qvtfskRr+g++KKA+ELS+LC+ae+a+iifs+ +k++ +
evm.TU.contig_30908.1 16 MNNESNLQVTFSKRRAGLFKKASELSTLCGAEIAIIIFSPGQKVFSF 62
689****************************************9987 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00432 | 2.7E-32 | 6 | 65 | IPR002100 | Transcription factor, MADS-box |
| PROSITE profile | PS50066 | 24.249 | 6 | 66 | IPR002100 | Transcription factor, MADS-box |
| CDD | cd00265 | 9.56E-34 | 7 | 74 | No hit | No description |
| SuperFamily | SSF55455 | 2.09E-26 | 7 | 91 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 1.6E-19 | 8 | 28 | IPR002100 | Transcription factor, MADS-box |
| Pfam | PF00319 | 1.2E-24 | 16 | 62 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 1.6E-19 | 28 | 43 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 1.6E-19 | 43 | 64 | IPR002100 | Transcription factor, MADS-box |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 233 aa Download sequence Send to blast |
MVRKSKGRQK VEMAKMNNES NLQVTFSKRR AGLFKKASEL STLCGAEIAI IIFSPGQKVF 60 SFGHPCVQTV LERFVSGNPP QAASGTMKLI ETHRNTSVRE LKMQLTHVLN QLEIEKKRGE 120 ELNHMKKANE NQCWWMARKN DMSLTQLQQL KASLDELKKN VAKHAEKILI RTQNNHHPHH 180 HHPNHPLFLG SSSGGASLPF ETKPAGFSSS IVPFNNLNMM PPKYHGFGQG FF* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 3kov_A | 1e-17 | 7 | 91 | 1 | 85 | Myocyte-specific enhancer factor 2A |
| 3kov_B | 1e-17 | 7 | 91 | 1 | 85 | Myocyte-specific enhancer factor 2A |
| 3kov_I | 1e-17 | 7 | 91 | 1 | 85 | Myocyte-specific enhancer factor 2A |
| 3kov_J | 1e-17 | 7 | 91 | 1 | 85 | Myocyte-specific enhancer factor 2A |
| 3p57_A | 1e-17 | 7 | 91 | 1 | 85 | Myocyte-specific enhancer factor 2A |
| 3p57_B | 1e-17 | 7 | 91 | 1 | 85 | Myocyte-specific enhancer factor 2A |
| 3p57_C | 1e-17 | 7 | 91 | 1 | 85 | Myocyte-specific enhancer factor 2A |
| 3p57_D | 1e-17 | 7 | 91 | 1 | 85 | Myocyte-specific enhancer factor 2A |
| 3p57_I | 1e-17 | 7 | 91 | 1 | 85 | Myocyte-specific enhancer factor 2A |
| 3p57_J | 1e-17 | 7 | 91 | 1 | 85 | Myocyte-specific enhancer factor 2A |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor. Required for suppression of cellularization and promotion of nuclear proliferation during early endosperm development. The FERTILIZATION-INDEPENDENT SEED (FIS) polycomb complex is required for suppression of ALG62 expression at the end of the syncytial phase of endosperm development. {ECO:0000269|PubMed:18334668}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_30908.1 |
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | AC238590 | 1e-147 | AC238590.1 Carica papaya BAC clone 12I03, complete sequence. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021911634.1 | 1e-173 | agamous-like MADS-box protein AGL62 | ||||
| Swissprot | Q9FKK2 | 3e-58 | AGL62_ARATH; Agamous-like MADS-box protein AGL62 | ||||
| TrEMBL | A0A067EEZ4 | 4e-94 | A0A067EEZ4_CITSI; Uncharacterized protein | ||||
| STRING | evm.TU.contig_30908.1 | 1e-172 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM86 | 28 | 390 | Representative plant | OGRP16 | 17 | 761 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G60440.1 | 9e-60 | AGAMOUS-like 62 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_30908.1 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




