![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_31184.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 332aa MW: 36512.1 Da PI: 4.8653 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 17 | 1.1e-05 | 277 | 319 | 7 | 54 |
HHHHHHHHHHHHHHHHHHCTSCC.C...TTS-STCHHHHHHHHHHHHHH CS
HLH 7 erErrRRdriNsafeeLrellPk.askapskKlsKaeiLekAveYIksL 54
e+ r RR++i++ + Lr+++P+ K + +L +A++Y+ksL
evm.TU.contig_31184.1 277 ENKRLRREKIRETVSVLRSIIPNgE-----DKDP-MVVLDEAIDYLKSL 319
67799******************44.....4444.89**********99 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 11.299 | 270 | 319 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 5.89E-8 | 273 | 324 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 0.0045 | 276 | 325 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 1.36E-5 | 280 | 320 | No hit | No description |
| Gene3D | G3DSA:4.10.280.10 | 5.6E-7 | 280 | 326 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 332 aa Download sequence Send to blast |
MVCQAASQTR FRALKYENGI AGSATIVVRV IACFQPLQDC QILVLSGWER TLDPGFLGID 60 WNCNPLIFIP PVLHFIPLAR IKFRGGPGCA QKRFLVFDQS GCQTRLIFSS GVETRNQHFT 120 PLGPKFPGVN REVPQSKEEL KIDIGMNSMD EVDGIHGTDV ESEMREDTEE LNALLYSDDS 180 DGDGDYTEDD EVTSTGHSPS TMTAHGKQGS FEGSTGGMSS YVGPSKKRKL FDHGDHDLHS 240 LLDTASSVNP CKCAEYEDDA ESSCGNHNRE IDLLSSENKR LRREKIRETV SVLRSIIPNG 300 EDKDPMVVLD EAIDYLKSLK LKAKALGLNA L* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_31184.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | AM486483 | 7e-35 | AM486483.2 Vitis vinifera contig VV78X018809.10, whole genome shotgun sequence. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021911619.1 | 1e-178 | LOW QUALITY PROTEIN: transcription factor bHLH145 | ||||
| TrEMBL | A0A1R3GHW6 | 1e-104 | A0A1R3GHW6_9ROSI; Uncharacterized protein | ||||
| STRING | evm.TU.contig_31184.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM10530 | 5 | 9 | Representative plant | OGRP5768 | 3 | 4 |
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_31184.1 |




