![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_31438.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 340aa MW: 38511.7 Da PI: 7.284 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 16.9 | 1.8e-05 | 173 | 192 | 1 | 20 |
EEETTTTEEESSHHHHHHHH CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHi 20
++Cp C k+F+ nL+ H+
evm.TU.contig_31438.1 173 FSCPVCYKTFNKYNNLQMHM 192
89*****************9 PP
| |||||||
| 2 | zf-C2H2 | 17.6 | 1.1e-05 | 257 | 279 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
++C +CgksF k + ++H +++
evm.TU.contig_31438.1 257 FTCRKCGKSFAVKGDWRTHEKNC 279
89*****************9987 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF57667 | 6.17E-5 | 166 | 195 | No hit | No description |
| PROSITE profile | PS50157 | 10.138 | 173 | 200 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 0.56 | 173 | 195 | IPR015880 | Zinc finger, C2H2-like |
| Pfam | PF13912 | 1.2E-4 | 173 | 192 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 175 | 195 | IPR007087 | Zinc finger, C2H2 |
| SuperFamily | SSF57667 | 1.16E-6 | 241 | 277 | No hit | No description |
| Gene3D | G3DSA:3.30.160.60 | 6.3E-6 | 243 | 277 | IPR013087 | Zinc finger C2H2-type/integrase DNA-binding domain |
| PROSITE profile | PS50157 | 8.891 | 257 | 277 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 28 | 257 | 277 | IPR015880 | Zinc finger, C2H2-like |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003676 | Molecular Function | nucleic acid binding | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 340 aa Download sequence Send to blast |
MTDPYSSNLF NGWFNFIPSH HPYYSSSSCY PFSSNNNYNC YSTNAPISSI TVPSSPPLRE 60 ALPLINYLNS TTRYQDQQEH SSSNSMEEDN KCKIMNRGAK ESFLFSSTEE DESGVALQIG 120 LPSPSSDLGI SQSDPEMADK EVSAVSEYPF ETLNKGQYWI PTPSQILIGP TQFSCPVCYK 180 TFNKYNNLQM HMWGHGSQYR KGPDSLKGSQ PTAMLRLPCY CCAPGCKHNI DHPRARPLKD 240 FRTLQTHYKR KHGTKPFTCR KCGKSFAVKG DWRTHEKNCG IIWYCICGSD FKHKRSLKDH 300 IRAFGYGHAA LNNNCVDFFL QEDDEPASEI EHDGEQSCSX |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcriptional regulator required for normal differentiation of the ovary transmitting tract cells and pollen tube growth. In Arabidopsis, the transmitting tract facilitates the transport of pollen tubes to the ovules for fertilization (PubMed:17600712). May play a role in the regulation of AGL8/FUL, which is required for normal pattern of cell division, expansion and differentiation during morphogenesis of the silique (PubMed:23515580). Plays a role in replum development by the activation of the homeobox protein KNAT1 (PubMed:25039392). {ECO:0000269|PubMed:17600712, ECO:0000269|PubMed:23515580, ECO:0000269|PubMed:25039392}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_31438.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | BT135770 | 2e-87 | BT135770.1 Medicago truncatula clone JCVI-FLMt-15M3 unknown mRNA. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021911594.1 | 0.0 | zinc finger protein WIP2-like | ||||
| Swissprot | Q9SVY1 | 1e-113 | ZWIP2_ARATH; Zinc finger protein WIP2 | ||||
| TrEMBL | A0A1J7H012 | 1e-150 | A0A1J7H012_LUPAN; Uncharacterized protein | ||||
| STRING | evm.TU.contig_31438.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM239 | 28 | 237 | Representative plant | OGRP410 | 15 | 97 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G57670.1 | 1e-114 | C2H2 family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_31438.1 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




