![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_32926.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 246aa MW: 26992.4 Da PI: 5.2632 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 19.8 | 2.1e-06 | 120 | 141 | 2 | 23 |
EETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 2 kCpdCgksFsrksnLkrHirtH 23
+Cp C+k Fs++ + H+++H
evm.TU.contig_32926.1 120 SCPECDKKFSSWKAMFGHMKKH 141
6********************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50157 | 9.162 | 119 | 146 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 0.0023 | 119 | 141 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE pattern | PS00028 | 0 | 121 | 141 | IPR007087 | Zinc finger, C2H2 |
| Pfam | PF13912 | 3.1E-6 | 121 | 143 | IPR007087 | Zinc finger, C2H2 |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 246 aa Download sequence Send to blast |
MSDEQVPGSP STVNEENQQE LVIQNLDHPD KASSQGSHDH LNPNDHVNPD DHEEKLERHE 60 YEKTEEAPTA NKGGGDGSGQ KKKRKGRSKV DGDDQVGSSS GGVRKHKRPR VLDAPNCKPS 120 CPECDKKFSS WKAMFGHMKK HPGKGYEGAF PPPKFTPPTS PKKPVSADEQ RGIEEAVPAL 180 LHLARRMTGT DDDRETEEDG GGTRREIEIN LNDSQKPQEE EPPSLSETGD VKGFDLNLTP 240 PHEDN* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_32926.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021911482.1 | 1e-180 | uncharacterized protein LOC110825339 | ||||
| STRING | evm.TU.contig_32926.1 | 1e-180 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5875 | 22 | 41 | Representative plant | OGRP11290 | 3 | 5 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G35700.1 | 3e-08 | C2H2 family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_32926.1 |




