| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_33298.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | NAC | ||||||||
| Protein Properties | Length: 328aa MW: 37419.4 Da PI: 9.1114 | ||||||||
| Description | NAC family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | NAM | 159.1 | 1.8e-49 | 10 | 137 | 1 | 128 |
NAM 1 lppGfrFhPtdeelvveyLkkkvegkkleleevikevdiykvePwdLpkkvkaeekewyfFskrdkkyatgkrknratksgyWkatgk 88
lppGfrF P+deel+v+yLk+k+ +++l++ ++i+++++yk++Pw+Lp+k+ +e+ew+fFs+rd+ky++g r+nra++sgyWkatg+
evm.TU.contig_33298.1 10 LPPGFRFYPSDEELIVHYLKNKTYSTPLPA-SIIADIHLYKYNPWELPNKALFGEDEWFFFSPRDRKYPNGVRPNRAAASGYWKATGT 96
79****************************.89***************88888999******************************** PP
NAM 89 dkevlsk.kgelvglkktLvfykgrapkgektdWvmheyrl 128
dk++l++ +++ vg+kk Lvfykgr pkg ktdW+m+eyrl
evm.TU.contig_33298.1 97 DKPILTScGTKSVGVKKALVFYKGRPPKGIKTDWIMQEYRL 137
*****9978889***************************97 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF101941 | 2.88E-61 | 5 | 162 | IPR003441 | NAC domain |
| PROSITE profile | PS51005 | 58.162 | 10 | 162 | IPR003441 | NAC domain |
| Pfam | PF02365 | 5.1E-25 | 11 | 137 | IPR003441 | NAC domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 328 aa Download sequence Send to blast |
MFAFSDRLQL PPGFRFYPSD EELIVHYLKN KTYSTPLPAS IIADIHLYKY NPWELPNKAL 60 FGEDEWFFFS PRDRKYPNGV RPNRAAASGY WKATGTDKPI LTSCGTKSVG VKKALVFYKG 120 RPPKGIKTDW IMQEYRLLDT IVWKQKGSMR LDDWVLCRVR QKNSIPKNTW EDRNSPSSQT 180 VVTGDSTNNV NEKWPLDKNS KTQLANNSLL PDCPLLPYIF ASEDLPCMET IATSISFQNS 240 GCGNHNNFGT NNPRLSVSCF HSLFNPLKRK NTEEQNLAPA PCRKLRKEEM KDIPIGHDGF 300 QDISISRALN QFEVYLYRSG DSQHPDP* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 1ut4_A | 5e-67 | 7 | 164 | 14 | 167 | NO APICAL MERISTEM PROTEIN |
| 1ut4_B | 5e-67 | 7 | 164 | 14 | 167 | NO APICAL MERISTEM PROTEIN |
| 1ut7_A | 5e-67 | 7 | 164 | 14 | 167 | NO APICAL MERISTEM PROTEIN |
| 1ut7_B | 5e-67 | 7 | 164 | 14 | 167 | NO APICAL MERISTEM PROTEIN |
| 3swm_A | 5e-67 | 7 | 164 | 17 | 170 | NAC domain-containing protein 19 |
| 3swm_B | 5e-67 | 7 | 164 | 17 | 170 | NAC domain-containing protein 19 |
| 3swm_C | 5e-67 | 7 | 164 | 17 | 170 | NAC domain-containing protein 19 |
| 3swm_D | 5e-67 | 7 | 164 | 17 | 170 | NAC domain-containing protein 19 |
| 3swp_A | 5e-67 | 7 | 164 | 17 | 170 | NAC domain-containing protein 19 |
| 3swp_B | 5e-67 | 7 | 164 | 17 | 170 | NAC domain-containing protein 19 |
| 3swp_C | 5e-67 | 7 | 164 | 17 | 170 | NAC domain-containing protein 19 |
| 3swp_D | 5e-67 | 7 | 164 | 17 | 170 | NAC domain-containing protein 19 |
| 4dul_A | 5e-67 | 7 | 164 | 14 | 167 | NAC domain-containing protein 19 |
| 4dul_B | 5e-67 | 7 | 164 | 14 | 167 | NAC domain-containing protein 19 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor of the NAC family. May be associated with anther development and pollen production (Probable). Required for normal seed development and morphology (PubMed:18849494). {ECO:0000269|PubMed:18849494, ECO:0000305|PubMed:21107887}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_33298.1 |
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021911441.1 | 0.0 | NAC transcription factor 25-like | ||||
| Swissprot | Q8GY42 | 6e-80 | NAC25_ARATH; NAC transcription factor 25 | ||||
| TrEMBL | A0A2P5YUN4 | 1e-133 | A0A2P5YUN4_GOSBA; Uncharacterized protein | ||||
| STRING | evm.TU.contig_33298.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM17560 | 8 | 10 | Representative plant | OGRP17 | 15 | 800 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G61110.1 | 3e-82 | NAC domain containing protein 25 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_33298.1 |