![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_34071.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | Dof | ||||||||
| Protein Properties | Length: 303aa MW: 33355.9 Da PI: 7.3018 | ||||||||
| Description | Dof family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-Dof | 128.1 | 2.5e-40 | 36 | 96 | 2 | 62 |
zf-Dof 2 kekalkcprCdstntkfCyynnyslsqPryfCkaCrryWtkGGalrnvPvGggrrknkkss 62
+++alkcprCdst+tkfCyynnyslsqPryfCk+CrryWtkGG+lrn+PvGgg+rknkk+s
evm.TU.contig_34071.1 36 HDQALKCPRCDSTHTKFCYYNNYSLSQPRYFCKTCRRYWTKGGTLRNIPVGGGCRKNKKVS 96
7899******************************************************975 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| ProDom | PD007478 | 3.0E-29 | 34 | 94 | IPR003851 | Zinc finger, Dof-type |
| Pfam | PF02701 | 9.4E-34 | 37 | 94 | IPR003851 | Zinc finger, Dof-type |
| PROSITE profile | PS50884 | 29.189 | 40 | 94 | IPR003851 | Zinc finger, Dof-type |
| PROSITE pattern | PS01361 | 0 | 42 | 78 | IPR003851 | Zinc finger, Dof-type |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0010067 | Biological Process | procambium histogenesis | ||||
| GO:0010087 | Biological Process | phloem or xylem histogenesis | ||||
| GO:0045893 | Biological Process | positive regulation of transcription, DNA-templated | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 303 aa Download sequence Send to blast |
GTIHEDQSGM DSSSPPSGDM LTCSRPLMER RLRPQHDQAL KCPRCDSTHT KFCYYNNYSL 60 SQPRYFCKTC RRYWTKGGTL RNIPVGGGCR KNKKVSATSS KKANDHHHQS INQISTPGSS 120 SSHHNHNPTD LHLSFPDVQF SQHLTTILGA HHGIGNPGDD DHHHHHLMQL ENPRPIDFME 180 SKYDFIGGMV GGGIGDHMGS NRGLGIGNFN GVCSSPFGLA IDGNDNGSFI DSCQRLMLPY 240 DALNEEQNTI DVKPNPKSLL SLQWQDQEVG KDNTTFGYLN NLGSWTGMIN GYGSSTTTNQ 300 LV* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor that binds specifically to a 5'-AA[AG]G-3' consensus core sequence (By similarity). Promotes expression (PubMed:19915089). The PEAR proteins (e.g. DOF2.4, DOF5.1, DOF3.2, DOF1.1, DOF5.6 and DOF5.3) activate gene expression that promotes radial growth of protophloem sieve elements (PubMed:30626969). Involved in the regulation of interfascicular cambium formation and vascular tissue development, particularly at a very early stage during inflorescence stem development; promotes both cambium activity and phloem specification, but prevents xylem specification (PubMed:19915089). {ECO:0000250|UniProtKB:Q9M2U1, ECO:0000269|PubMed:19915089, ECO:0000269|PubMed:30626969}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00580 | DAP | Transfer from AT5G62940 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_34071.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021911367.1 | 0.0 | dof zinc finger protein DOF5.6 | ||||
| Swissprot | Q9FM03 | 2e-40 | DOF56_ARATH; Dof zinc finger protein DOF5.6 | ||||
| TrEMBL | A0A2C9UKJ8 | 1e-127 | A0A2C9UKJ8_MANES; Uncharacterized protein | ||||
| STRING | evm.TU.contig_34071.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM6374 | 27 | 46 | Representative plant | OGRP38 | 17 | 445 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G62940.1 | 2e-37 | Dof family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_34071.1 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




