![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_38122.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | M-type_MADS | ||||||||
| Protein Properties | Length: 108aa MW: 11912.2 Da PI: 11.0305 | ||||||||
| Description | M-type_MADS family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | SRF-TF | 70.6 | 1.4e-22 | 18 | 61 | 3 | 46 |
--SHHHHHHHHHHHHHHHHHHHHHHHHHHT-EEEEEEE-TTSEE CS
SRF-TF 3 ienksnrqvtfskRrngilKKAeELSvLCdaevaviifsstgkl 46
i+ +n qvtf+kRr+gi+KKA+E+S+LC+ae+aviifs+ kl
evm.TU.contig_38122.1 18 IKKATNLQVTFAKRRAGIFKKASEISTLCGAEIAVIIFSPAKKL 61
8999************************************9998 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00432 | 1.9E-23 | 8 | 67 | IPR002100 | Transcription factor, MADS-box |
| PROSITE profile | PS50066 | 21.194 | 8 | 61 | IPR002100 | Transcription factor, MADS-box |
| SuperFamily | SSF55455 | 8.89E-21 | 9 | 70 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 6.7E-17 | 10 | 30 | IPR002100 | Transcription factor, MADS-box |
| Pfam | PF00319 | 1.5E-21 | 17 | 61 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 6.7E-17 | 30 | 45 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 6.7E-17 | 45 | 66 | IPR002100 | Transcription factor, MADS-box |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 108 aa Download sequence Send to blast |
MEPPRKLKGR QMVEMVKIKK ATNLQVTFAK RRAGIFKKAS EISTLCGAEI AVIIFSPAKK 60 LINRFSGLIE QPLSANICMM DAHRNACLQG LNSQLNKLNS QLDAKKK* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor. Required for suppression of cellularization and promotion of nuclear proliferation during early endosperm development. The FERTILIZATION-INDEPENDENT SEED (FIS) polycomb complex is required for suppression of ALG62 expression at the end of the syncytial phase of endosperm development. {ECO:0000269|PubMed:18334668}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_38122.1 |
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | AC238637 | 4e-86 | AC238637.1 Carica papaya BAC clone 99B01, complete sequence. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021909162.1 | 3e-60 | agamous-like MADS-box protein AGL62 | ||||
| Swissprot | Q9FKK2 | 1e-26 | AGL62_ARATH; Agamous-like MADS-box protein AGL62 | ||||
| TrEMBL | A0A067L145 | 1e-29 | A0A067L145_JATCU; Uncharacterized protein | ||||
| STRING | evm.TU.contig_38122.1 | 2e-72 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM86 | 28 | 390 | Representative plant | OGRP16 | 17 | 761 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G60440.1 | 9e-24 | AGAMOUS-like 62 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_38122.1 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




