![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_38280.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | NAC | ||||||||
| Protein Properties | Length: 313aa MW: 35796.3 Da PI: 4.3176 | ||||||||
| Description | NAC family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | NAM | 65.7 | 1.4e-20 | 6 | 122 | 3 | 128 |
NAM 3 pGfrFhPtdeelvveyLkkkvegkkleleevikevdiykvePwdLpkkvkaeekewyfFskrdkkyatgkrknratksgyWkatgkdk 90
Gf+F P+deel + L+ +++g+ e+ ++ e+d y+ ePw k+e + y F++ +kk + +r +r++ g+Wk +
evm.TU.contig_38280.1 6 IGFHFTPSDEELF-QILAMELRGEY-EV-GAVIEADPYEKEPWLVF-D-KNEPTTFYVFTSLKKK--SRSRMERKVGCGTWKMERSA- 85
6***********9.78999999988.55.578899********995.2.2344455666666665..568************88775. PP
NAM 91 evlskkgelvglkktLvfykgrapkgektdWvmheyrl 128
ev++ +++++g kk+L+f ++++++e+ +W+mhey+l
evm.TU.contig_38280.1 86 EVVDWEENVIGFKKMLTFE-EKKKNTENGRWIMHEYSL 122
55555999**********8.5666779*********97 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS51005 | 23.485 | 4 | 136 | IPR003441 | NAC domain |
| SuperFamily | SSF101941 | 4.45E-24 | 6 | 136 | IPR003441 | NAC domain |
| Pfam | PF02365 | 3.5E-14 | 6 | 122 | IPR003441 | NAC domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 313 aa Download sequence Send to blast |
MDVERIGFHF TPSDEELFQI LAMELRGEYE VGAVIEADPY EKEPWLVFDK NEPTTFYVFT 60 SLKKKSRSRM ERKVGCGTWK MERSAEVVDW EENVIGFKKM LTFEEKKKNT ENGRWIMHEY 120 SLRDFDDYVL CKIRNKSIDK LQQPTKIKLA YHQQDNSNNT YKRKLSADTE DHNQNKIQCI 180 NSSFVMSTTG DVRIVEEMII TAPLAAGDIN PFTAAALLAT EYNNRELVEE MTVVEPLASE 240 DINSLATVAP LTTEYNDREV VEEMTITAPL VARDINPLAT AIPLAAEYND GEIAEEMTVA 300 APLQDEVEQN DNL |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 1ut4_A | 1e-12 | 7 | 136 | 20 | 165 | NO APICAL MERISTEM PROTEIN |
| 1ut4_B | 1e-12 | 7 | 136 | 20 | 165 | NO APICAL MERISTEM PROTEIN |
| 1ut7_A | 1e-12 | 7 | 136 | 20 | 165 | NO APICAL MERISTEM PROTEIN |
| 1ut7_B | 1e-12 | 7 | 136 | 20 | 165 | NO APICAL MERISTEM PROTEIN |
| 3swm_A | 1e-12 | 7 | 136 | 23 | 168 | NAC domain-containing protein 19 |
| 3swm_B | 1e-12 | 7 | 136 | 23 | 168 | NAC domain-containing protein 19 |
| 3swm_C | 1e-12 | 7 | 136 | 23 | 168 | NAC domain-containing protein 19 |
| 3swm_D | 1e-12 | 7 | 136 | 23 | 168 | NAC domain-containing protein 19 |
| 3swp_A | 1e-12 | 7 | 136 | 23 | 168 | NAC domain-containing protein 19 |
| 3swp_B | 1e-12 | 7 | 136 | 23 | 168 | NAC domain-containing protein 19 |
| 3swp_C | 1e-12 | 7 | 136 | 23 | 168 | NAC domain-containing protein 19 |
| 3swp_D | 1e-12 | 7 | 136 | 23 | 168 | NAC domain-containing protein 19 |
| 4dul_A | 1e-12 | 7 | 136 | 20 | 165 | NAC domain-containing protein 19 |
| 4dul_B | 1e-12 | 7 | 136 | 20 | 165 | NAC domain-containing protein 19 |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_38280.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021911077.1 | 0.0 | NAC domain-containing protein 55-like, partial | ||||
| STRING | evm.TU.contig_38280.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Representative plant | OGRP5881 | 2 | 18 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G15500.1 | 2e-14 | NAC domain containing protein 3 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_38280.1 |




