PlantTFDB
PlantRegMap/PlantTFDB v5.0
Plant Transcription Factor Database
Transcription Factor Information
Basic Information | Signature Domain | Sequence | 
Basic Information? help Back to Top
TF ID evm.TU.contig_40990.1
Organism
Taxonomic ID
Taxonomic Lineage
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
Family BES1
Protein Properties Length: 85aa    MW: 9842.39 Da    PI: 10.791
Description BES1 family protein
Gene Model
Gene Model ID Type Source Coding Sequence
evm.TU.contig_40990.1genomeASGPBView CDS
Signature Domain? help Back to Top
Signature Domain
No. Domain Score E-value Start End HMM Start HMM End
1DUF822161.55.5e-50273172
                 DUF822  1 ggsgrkptwkErEnnkrRERrRRaiaakiyaGLRaqGnyklpkraDnneVlkALcreAGwvvedDGttyrkg 72
                           ++++r+ptwkErEnnkrRERrRRaiaakiyaGLR++Gnyklpk++DnneVlkALc+eAGw+ve+DGttyrk 
  evm.TU.contig_40990.1  2 TSGTRMPTWKERENNKRRERRRRAIAAKIYAGLRMYGNYKLPKHCDNNEVLKALCNEAGWTVEEDGTTYRKL 73
                           5899******************************************************************96 PP

Protein Features ? help Back to Top
3D Structure
Database Entry ID E-value Start End InterPro ID Description
PfamPF056874.3E-47374IPR008540BES1/BZR1 plant transcription factor, N-terminal
Sequence ? help Back to Top
Protein Sequence    Length: 85 aa     Download sequence    Send to blast
MTSGTRMPTW KERENNKRRE RRRRAIAAKI YAGLRMYGNY KLPKHCDNNE VLKALCNEAG  60
WTVEEDGTTY RKLLARVLVA RFPA*
3D Structure ? help Back to Top
Structure
PDB ID Evalue Query Start Query End Hit Start Hit End Description
5zd4_A2e-23672372438Maltose-binding periplasmic protein,Protein BRASSINAZOLE-RESISTANT 1
5zd4_B2e-23672372438Maltose-binding periplasmic protein,Protein BRASSINAZOLE-RESISTANT 1
5zd4_C2e-23672372438Maltose-binding periplasmic protein,Protein BRASSINAZOLE-RESISTANT 1
5zd4_D2e-23672372438Maltose-binding periplasmic protein,Protein BRASSINAZOLE-RESISTANT 1
Search in ModeBase
Functional Description ? help Back to Top
Source Description
UniProtMay function in brassinosteroid signaling. {ECO:0000250}.
Cis-element ? help Back to Top
SourceLink
PlantRegMapevm.TU.contig_40990.1
Regulation -- PlantRegMap ? help Back to Top
Source Upstream Regulator Target Gene
PlantRegMapRetrieve-
Annotation -- Protein ? help Back to Top
Source Hit ID E-value Description
RefseqXP_015875603.17e-47BES1/BZR1 homolog protein 4 isoform X1
RefseqXP_023879306.16e-47BES1/BZR1 homolog protein 4-like isoform X1
RefseqXP_023879307.16e-47BES1/BZR1 homolog protein 4-like isoform X2
RefseqXP_024929005.17e-47BES1/BZR1 homolog protein 4 isoform X2
SwissprotQ5Z9E54e-29BZR3_ORYSJ; Protein BZR1 homolog 3
TrEMBLA0A0D2ULT46e-46A0A0D2ULT4_GOSRA; Uncharacterized protein
TrEMBLA0A2P5FDI84e-46A0A2P5FDI8_TREOI; BES1/BZR1 transcription factor
STRINGevm.TU.contig_40990.16e-56(Carica papaya)
Orthologous Group ? help Back to Top
LineageOrthologous Group IDTaxa NumberGene Number
MalvidsOGEM155111117
Representative plantOGRP15951542
Best hit in Arabidopsis thaliana ? help Back to Top
Hit ID E-value Description
AT1G78700.16e-29BES1/BZR1 homolog 4
Publications ? help Back to Top
  1. Kikuchi S, et al.
    Collection, mapping, and annotation of over 28,000 cDNA clones from japonica rice.
    Science, 2003. 301(5631): p. 376-9
    [PMID:12869764]