![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_43014.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | M-type_MADS | ||||||||
| Protein Properties | Length: 108aa MW: 12182.3 Da PI: 11.2171 | ||||||||
| Description | M-type_MADS family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | SRF-TF | 73.8 | 1.4e-23 | 18 | 64 | 3 | 49 |
--SHHHHHHHHHHHHHHHHHHHHHHHHHHT-EEEEEEE-TTSEEEEE CS
SRF-TF 3 ienksnrqvtfskRrngilKKAeELSvLCdaevaviifsstgklyey 49
i+ +n qvtf+kRr+gi+KKA+E+S+LC+aevaviifs+ k++ +
evm.TU.contig_43014.1 18 IKKATNLQVTFAKRRAGIFKKASEISTLCGAEVAVIIFSPAKKVFSF 64
8999***************************************9988 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00432 | 3.6E-31 | 8 | 67 | IPR002100 | Transcription factor, MADS-box |
| PROSITE profile | PS50066 | 24.768 | 8 | 68 | IPR002100 | Transcription factor, MADS-box |
| CDD | cd00265 | 8.86E-34 | 9 | 76 | No hit | No description |
| SuperFamily | SSF55455 | 1.44E-27 | 9 | 82 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 6.8E-20 | 10 | 30 | IPR002100 | Transcription factor, MADS-box |
| Pfam | PF00319 | 1.7E-23 | 17 | 64 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 6.8E-20 | 30 | 45 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 6.8E-20 | 45 | 66 | IPR002100 | Transcription factor, MADS-box |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 108 aa Download sequence Send to blast |
MEPHRKSKGR QKIEMVKIKK ATNLQVTFAK RRAGIFKKAS EISTLCGAEV AVIIFSPAKK 60 VFSFGSPSVE KLINRFNGLI EQPPSANRRM MDAHRNPYLQ GLNLQLNE |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 3mu6_A | 3e-16 | 9 | 78 | 1 | 70 | Myocyte-specific enhancer factor 2A |
| 3mu6_B | 3e-16 | 9 | 78 | 1 | 70 | Myocyte-specific enhancer factor 2A |
| 3mu6_C | 3e-16 | 9 | 78 | 1 | 70 | Myocyte-specific enhancer factor 2A |
| 3mu6_D | 3e-16 | 9 | 78 | 1 | 70 | Myocyte-specific enhancer factor 2A |
| 6byy_A | 4e-16 | 9 | 92 | 2 | 83 | MEF2 CHIMERA |
| 6byy_B | 4e-16 | 9 | 92 | 2 | 83 | MEF2 CHIMERA |
| 6byy_C | 4e-16 | 9 | 92 | 2 | 83 | MEF2 CHIMERA |
| 6byy_D | 4e-16 | 9 | 92 | 2 | 83 | MEF2 CHIMERA |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor. Required for suppression of cellularization and promotion of nuclear proliferation during early endosperm development. The FERTILIZATION-INDEPENDENT SEED (FIS) polycomb complex is required for suppression of ALG62 expression at the end of the syncytial phase of endosperm development. {ECO:0000269|PubMed:18334668}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_43014.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | AC238637 | 1e-129 | AC238637.1 Carica papaya BAC clone 99B01, complete sequence. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021910885.1 | 9e-75 | agamous-like MADS-box protein AGL62, partial | ||||
| Swissprot | Q9FKK2 | 1e-34 | AGL62_ARATH; Agamous-like MADS-box protein AGL62 | ||||
| TrEMBL | A0A067L145 | 5e-38 | A0A067L145_JATCU; Uncharacterized protein | ||||
| STRING | evm.TU.contig_43014.1 | 4e-74 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM86 | 28 | 390 | Representative plant | OGRP16 | 17 | 761 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G60440.1 | 6e-37 | AGAMOUS-like 62 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_43014.1 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




