![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.TU.contig_46440.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 188aa MW: 21346.7 Da PI: 6.1529 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 14.7 | 5.5e-05 | 128 | 159 | 9 | 45 |
HHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHH CS
HLH 9 ErrRRdriNsafeeLrellPkaskapskKlsKaeiLe 45
r RR+ri +++ L++l+P +Kl+ a++L
evm.TU.contig_46440.1 128 ARHRRERISEKIRILQRLVPGG-----TKLDTASMLD 159
699*****************86.....7888888885 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 10.594 | 119 | 168 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 3.79E-7 | 124 | 160 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 2.0E-5 | 124 | 160 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 6.23E-5 | 125 | 160 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0010197 | Biological Process | polar nucleus fusion | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 188 aa Download sequence Send to blast |
MDINHTNFPN HCWNNHEILS GEDGGVGHLH NQITFNSLCP PNYSHQIFSS SSPSSPPSTQ 60 IIPTYTTNLF AQNMEMDEEE EPEEELGAMK EMMYKIAAMQ PVDIDPTTIR KPKRRNVRIS 120 DDPQSVAARH RRERISEKIR ILQRLVPGGT KLDTASMLDE PFGTLSSWRG KFVFSSQTAS 180 KINGQEWX |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.TU.contig_46440.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021910733.1 | 1e-118 | LOW QUALITY PROTEIN: transcription factor HEC3-like | ||||
| TrEMBL | A0A2K1ZSJ8 | 4e-53 | A0A2K1ZSJ8_POPTR; Uncharacterized protein | ||||
| STRING | evm.TU.contig_46440.1 | 1e-139 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4449 | 27 | 54 | Representative plant | OGRP761 | 15 | 68 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G00120.1 | 1e-33 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.TU.contig_46440.1 |




