![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_1.162 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | MIKC_MADS | ||||||||
| Protein Properties | Length: 245aa MW: 28238.3 Da PI: 8.8324 | ||||||||
| Description | MIKC_MADS family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | SRF-TF | 98.4 | 3e-31 | 9 | 59 | 1 | 51 |
S---SHHHHHHHHHHHHHHHHHHHHHHHHHHT-EEEEEEE-TTSEEEEEE- CS
SRF-TF 1 krienksnrqvtfskRrngilKKAeELSvLCdaevaviifsstgklyeyss 51
krienk+nrqvtfskRr+g+lKKA+E+SvLCdaeva+i+fs++gkl+eys+
evm.model.supercontig_1.162 9 KRIENKINRQVTFSKRRAGLLKKAHEISVLCDAEVALIVFSHKGKLFEYST 59
79***********************************************96 PP
| |||||||
| 2 | K-box | 108.9 | 5.6e-36 | 78 | 174 | 4 | 100 |
K-box 4 ssgksleeakaeslqqelakLkkeienLqreqRhllGedLesLslkeLqqLeqqLekslkkiRskKnellleqieelqkkek 85
++ ++ +++ + +++ e+++Lk +ie Lqr++Rh++GedLesLslke+q+LeqqL+++lk+iRs+Kn+l++e+i+elq+kek
evm.model.supercontig_1.162 78 RQLVAPDSELQGNWSLEYNRLKTKIELLQRNHRHYMGEDLESLSLKEIQNLEQQLDTALKHIRSRKNQLMYESISELQRKEK 159
5566666677889********************************************************************* PP
K-box 86 elqeenkaLrkklee 100
++qe+n++L k+++e
evm.model.supercontig_1.162 160 AIQEQNTMLAKQIKE 174
************987 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50066 | 32.352 | 1 | 61 | IPR002100 | Transcription factor, MADS-box |
| SMART | SM00432 | 9.2E-41 | 1 | 60 | IPR002100 | Transcription factor, MADS-box |
| CDD | cd00265 | 3.27E-43 | 2 | 79 | No hit | No description |
| SuperFamily | SSF55455 | 2.35E-34 | 2 | 90 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 5.4E-31 | 3 | 23 | IPR002100 | Transcription factor, MADS-box |
| PROSITE pattern | PS00350 | 0 | 3 | 57 | IPR002100 | Transcription factor, MADS-box |
| Pfam | PF00319 | 7.6E-26 | 10 | 57 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 5.4E-31 | 23 | 38 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 5.4E-31 | 38 | 59 | IPR002100 | Transcription factor, MADS-box |
| PROSITE profile | PS51297 | 17.343 | 88 | 178 | IPR002487 | Transcription factor, K-box |
| Pfam | PF01486 | 9.4E-30 | 88 | 172 | IPR002487 | Transcription factor, K-box |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009933 | Biological Process | meristem structural organization | ||||
| GO:0010076 | Biological Process | maintenance of floral meristem identity | ||||
| GO:0010582 | Biological Process | floral meristem determinacy | ||||
| GO:0045893 | Biological Process | positive regulation of transcription, DNA-templated | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0046982 | Molecular Function | protein heterodimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 245 aa Download sequence Send to blast |
MGRGRVQLKR IENKINRQVT FSKRRAGLLK KAHEISVLCD AEVALIVFSH KGKLFEYSTD 60 SCMEKILERY ERYSYAERQL VAPDSELQGN WSLEYNRLKT KIELLQRNHR HYMGEDLESL 120 SLKEIQNLEQ QLDTALKHIR SRKNQLMYES ISELQRKEKA IQEQNTMLAK QIKEKEKTLA 180 QQAQWGQQNG NAGPSTVPTF MLPQPPPCLN IGGAYQEEGA EMRRNDLELT LEPIYSTHLG 240 CFAA* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 6byy_A | 4e-22 | 1 | 74 | 1 | 73 | MEF2 CHIMERA |
| 6byy_B | 4e-22 | 1 | 74 | 1 | 73 | MEF2 CHIMERA |
| 6byy_C | 4e-22 | 1 | 74 | 1 | 73 | MEF2 CHIMERA |
| 6byy_D | 4e-22 | 1 | 74 | 1 | 73 | MEF2 CHIMERA |
| 6bz1_A | 4e-22 | 1 | 74 | 1 | 73 | MEF2 CHIMERA |
| 6bz1_B | 4e-22 | 1 | 74 | 1 | 73 | MEF2 CHIMERA |
| 6bz1_C | 4e-22 | 1 | 74 | 1 | 73 | MEF2 CHIMERA |
| 6bz1_D | 4e-22 | 1 | 74 | 1 | 73 | MEF2 CHIMERA |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor involved in flower development. {ECO:0000250|UniProtKB:Q0HA25}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00096 | ChIP-seq | Transfer from AT1G69120 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_1.162 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021910321.1 | 0.0 | truncated transcription factor CAULIFLOWER A-like isoform X2 | ||||
| Swissprot | Q6E6S7 | 1e-142 | AP1_VITVI; Agamous-like MADS-box protein AP1 | ||||
| TrEMBL | A0A061EAI9 | 1e-150 | A0A061EAI9_THECC; K-box region and MADS-box transcription factor family protein | ||||
| STRING | evm.model.supercontig_1.162 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM792 | 25 | 110 | Representative plant | OGRP16 | 17 | 761 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G69120.1 | 1e-132 | MIKC_MADS family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_1.162 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




