![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_1.277 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C3H | ||||||||
| Protein Properties | Length: 148aa MW: 16757.4 Da PI: 10.287 | ||||||||
| Description | C3H family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-CCCH | 18.4 | 3.9e-06 | 92 | 113 | 4 | 26 |
---SGGGGTS--TTTTT-SS-SS CS
zf-CCCH 4 elCrffartGtCkyGdrCkFaHg 26
C f+ + G+C G +CkF+H+
evm.model.supercontig_1.277 92 IVCEFYKA-GQCTKGFKCKFSHD 113
57996666.*************7 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50103 | 15.094 | 88 | 115 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 9.94E-7 | 88 | 113 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 7.4E-5 | 88 | 114 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 1.0E-4 | 90 | 114 | IPR000571 | Zinc finger, CCCH-type |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 148 aa Download sequence Send to blast |
MPPKVQSKAD LAKKQKIVED KTFGLKNKNK SKNVQKYVQN LKQSVQPKPD STKVAVKKKK 60 EEEKAREKEL NDLFKVAISQ PKVPVGVDPK SIVCEFYKAG QCTKGFKCKF SHDLNVQRKG 120 EKIDIYSDKR DQGSQTEICL CYRSYAS* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_1.277 |
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | LN681896 | 7e-36 | LN681896.1 Cucumis melo genomic scaffold, anchoredscaffold00016. | |||
| GenBank | LN713264 | 7e-36 | LN713264.1 Cucumis melo genomic chromosome, chr_10. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_020574423.1 | 1e-78 | zinc finger CCCH domain-containing protein 21 | ||||
| Refseq | XP_020595047.1 | 2e-80 | zinc finger CCCH domain-containing protein 21-like, partial | ||||
| Swissprot | Q9SK74 | 4e-70 | C3H21_ARATH; Zinc finger CCCH domain-containing protein 21 | ||||
| TrEMBL | A0A2P2K2T8 | 2e-78 | A0A2P2K2T8_RHIMU; Zinc finger CCCH domain-containing protein 11 | ||||
| STRING | evm.model.supercontig_1.277 | 1e-101 | (Carica papaya) | ||||
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G20280.1 | 6e-69 | C3H family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_1.277 |




