![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_1.3 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 293aa MW: 32004.5 Da PI: 8.1962 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 12.4 | 0.00047 | 106 | 128 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
y+C+ C++sF++ L H +H
evm.model.supercontig_1.3 106 YECKTCNRSFPSFQALGGHRASH 128
99**********99999998887 PP
| |||||||
| 2 | zf-C2H2 | 13.3 | 0.00025 | 193 | 215 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
++C++Cg F++ L H+r+H
evm.model.supercontig_1.3 193 HECSICGSEFTSGQALGGHMRRH 215
78********************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF57667 | 7.22E-8 | 105 | 128 | No hit | No description |
| Pfam | PF13912 | 2.0E-13 | 105 | 130 | IPR007087 | Zinc finger, C2H2 |
| PROSITE profile | PS50157 | 11.926 | 106 | 133 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 0.06 | 106 | 128 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE pattern | PS00028 | 0 | 108 | 128 | IPR007087 | Zinc finger, C2H2 |
| SuperFamily | SSF57667 | 7.22E-8 | 188 | 215 | No hit | No description |
| PROSITE profile | PS50157 | 9.785 | 193 | 220 | IPR007087 | Zinc finger, C2H2 |
| Pfam | PF13912 | 3.3E-11 | 193 | 216 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 0.019 | 193 | 215 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE pattern | PS00028 | 0 | 195 | 215 | IPR007087 | Zinc finger, C2H2 |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 293 aa Download sequence Send to blast |
MEAQGDQVSL PPSHHHQSHR MMIKGKRTKR QRQSSPLIPM ISTSSTASAG VVDHDYVSSP 60 TSSSTEEEED MANCLILLAQ GRHHPRRLQE VTSSKVSSDQ KFNQVYECKT CNRSFPSFQA 120 LGGHRASHKK PKPNFPSKDD VEDQAQVPKI NMIIINSSPP PPQTTISLQP NSNTHKAYHH 180 STSSGNQNKS KIHECSICGS EFTSGQALGG HMRRHRTAAA AAAGGGLQDT SSTNESNNGE 240 ITHEMKPRNI LALDLNLPAP EDHDHRGETK FQYGSTQQGL VFSTPALVDC HY* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_1.3 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021910383.1 | 0.0 | zinc finger protein ZAT5 | ||||
| TrEMBL | U5GN93 | 9e-75 | U5GN93_POPTR; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_1.3 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5862 | 27 | 48 | Representative plant | OGRP2350 | 10 | 35 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G28200.1 | 5e-50 | C2H2 family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_1.3 |




