![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_10.254 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 197aa MW: 21301.6 Da PI: 9.3133 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 61.7 | 1.6e-19 | 5 | 55 | 1 | 55 |
AP2 1 sgykGVrwdkkrgrWvAeIrdpsengkr..krfslgkfgtaeeAakaaiaarkkleg 55
++++GVr+++ +g+Wv+eIr+p +r++lg+f taeeAa+a+++a+ ++g
evm.model.supercontig_10.254 5 KKFRGVRQRH-WGSWVSEIRHP-----LlkRRVWLGTFETAEEAARAYDEAAILMNG 55
59*******9.**********8.....334**********************98876 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| CDD | cd00018 | 1.17E-34 | 5 | 65 | No hit | No description |
| SMART | SM00380 | 1.1E-40 | 6 | 69 | IPR001471 | AP2/ERF domain |
| Pfam | PF00847 | 1.1E-12 | 6 | 55 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 22.01 | 6 | 63 | IPR001471 | AP2/ERF domain |
| Gene3D | G3DSA:3.30.730.10 | 3.4E-33 | 6 | 64 | IPR001471 | AP2/ERF domain |
| SuperFamily | SSF54171 | 1.11E-20 | 6 | 65 | IPR016177 | DNA-binding domain |
| PRINTS | PR00367 | 1.1E-10 | 7 | 18 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 1.1E-10 | 29 | 45 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0009414 | Biological Process | response to water deprivation | ||||
| GO:0010143 | Biological Process | cutin biosynthetic process | ||||
| GO:0010166 | Biological Process | wax metabolic process | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 197 aa Download sequence Send to blast |
MVQSKKFRGV RQRHWGSWVS EIRHPLLKRR VWLGTFETAE EAARAYDEAA ILMNGRSAKT 60 NFPVSTAGNP SSASENWNIP PPPSALSATV SQKLSKCRKS SSPSLTCLRL DTTSSHIGVW 120 QKKAGSRADS NWVMTVELNV NRSSMEGNNN NNNNNSNTVE VSQSAGGEEG TNGGGSGLGE 180 EERIALQMIE ELLNGN* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 2gcc_A | 8e-17 | 2 | 64 | 1 | 64 | ATERF1 |
| 3gcc_A | 8e-17 | 2 | 64 | 1 | 64 | ATERF1 |
| 5wx9_A | 2e-16 | 6 | 63 | 14 | 72 | Ethylene-responsive transcription factor ERF096 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Promotes cuticle formation by inducing the expression of enzymes involved in wax biosynthesis (PubMed:15070782, PubMed:15319479). Confers drought resistance (PubMed:15319479). Acts as a transcriptional activator. Binds to the GCC-box pathogenesis-related promoter element. May be involved in the regulation of gene expression by stress factors and by components of stress signal transduction pathways (By similarity). {ECO:0000250, ECO:0000269|PubMed:15070782, ECO:0000269|PubMed:15319479}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_10.254 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021906537.1 | 1e-141 | ethylene-responsive transcription factor WIN1-like | ||||
| Swissprot | Q9XI33 | 4e-72 | WIN1_ARATH; Ethylene-responsive transcription factor WIN1 | ||||
| TrEMBL | V4STL1 | 2e-81 | V4STL1_9ROSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_10.254 | 1e-140 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM834 | 28 | 116 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G15360.1 | 1e-55 | ERF family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_10.254 |




