![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_101.39 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 169aa MW: 18929.1 Da PI: 7.2149 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 60.7 | 3.5e-19 | 30 | 79 | 2 | 55 |
AP2 2 gykGVrwdkkrgrWvAeIrdpsengkrkrfslgkfgtaeeAakaaiaarkkleg 55
+y+GVr ++ +g+Wv+eIr+p++ + r++lg++ t+e+Aa+a++ a+++++g
evm.model.supercontig_101.39 30 KYRGVRMRS-WGKWVSEIREPRK---KSRIWLGTYPTPEMAARAHDVAALAIKG 79
8*****998.**********843...6***********************9987 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF54171 | 8.5E-22 | 30 | 87 | IPR016177 | DNA-binding domain |
| Pfam | PF00847 | 1.5E-13 | 30 | 79 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 23.301 | 30 | 87 | IPR001471 | AP2/ERF domain |
| SMART | SM00380 | 6.4E-38 | 30 | 93 | IPR001471 | AP2/ERF domain |
| CDD | cd00018 | 1.21E-34 | 30 | 87 | No hit | No description |
| Gene3D | G3DSA:3.30.730.10 | 2.7E-32 | 30 | 88 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 3.1E-10 | 31 | 42 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 3.1E-10 | 53 | 69 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0044212 | Molecular Function | transcription regulatory region DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 169 aa Download sequence Send to blast |
METHHLNLLP STTNPNPNPK KRQRRSDEEK YRGVRMRSWG KWVSEIREPR KKSRIWLGTY 60 PTPEMAARAH DVAALAIKGS SAHLNFPQFA HQLPRPLTTS PKDIQAAAAK AAASTSFQAK 120 HSSTGDDDAH DEDTLFDLPD LVDSNAAFCY CSSSWPPDEL PEFVWDNF* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5wx9_A | 1e-16 | 30 | 87 | 14 | 72 | Ethylene-responsive transcription factor ERF096 |
| Search in ModeBase | ||||||
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 18 | 24 | PKKRQRR |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probably acts as a transcriptional activator. Binds to the GCC-box pathogenesis-related promoter element. May be involved in the regulation of gene expression by stress factors and by components of stress signal transduction pathways (By similarity). {ECO:0000250}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00312 | DAP | Transfer from AT2G44940 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_101.39 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021892753.1 | 1e-123 | ethylene-responsive transcription factor ERF035-like | ||||
| Swissprot | Q8LBQ7 | 9e-48 | ERF34_ARATH; Ethylene-responsive transcription factor ERF034 | ||||
| TrEMBL | A0A1S2YUE1 | 1e-55 | A0A1S2YUE1_CICAR; ethylene-responsive transcription factor ERF034 | ||||
| STRING | evm.model.supercontig_101.39 | 1e-123 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM185 | 28 | 283 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G44940.1 | 1e-46 | ERF family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_101.39 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




