PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_1024.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 511aa MW: 56000.7 Da PI: 5.5565 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 38.8 | 1.7e-12 | 352 | 395 | 7 | 55 |
HHHHHHHHHHHHHHHHHHCTSCC.C...TTS-STCHHHHHHHHHHHHHHH CS
HLH 7 erErrRRdriNsafeeLrellPk.askapskKlsKaeiLekAveYIksLq 55
++ErrRR+++N+++ Lr+++Pk + K++ a+iL A+eY+k+Lq
evm.model.supercontig_1024.1 352 MAERRRRKKLNDRLYMLRSVVPKiS------KMDRASILGDAIEYLKELQ 395
79*********************66......******************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 15.764 | 345 | 394 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 5.37E-17 | 348 | 419 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 4.3E-10 | 351 | 395 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 1.4E-15 | 351 | 400 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 5.3E-16 | 352 | 406 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 4.49E-14 | 352 | 399 | No hit | No description |
| CDD | cd04873 | 1.10E-6 | 467 | 508 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 511 aa Download sequence Send to blast |
MLPRVTGVVW MEDREEGHSS SWRRNNEVTN TNCGMAESKD EITSVVTFKS MFDVGDDWYA 60 ANNSMHNHRD MRDVDFSSNL GDPDNLLLQP VDSSASCSPS SSMFNNLDPF QLHYFLSPKP 120 TLPSFLNVAP NNPLENGIDL AEIAFLESQA TNASSTLFNR GSGALSNFTD LISSSQITAP 180 NMCSEPQFST TRMLQLPEAS AGFTGFRGFD ENSGNTLFTN RSKLLRPLEE FPSTGAQPTI 240 FQKRAALRKS LSDSGYNFGI LGAGSDQLLN GKDRDEGKTE MGEKTMNMGN GYVLDDASVD 300 GSGLNYDSDE LVDHSKVEET GKNGGNSSNA NSTVTGGDQK GKRKGMPAKN LMAERRRRKK 360 LNDRLYMLRS VVPKISKMDR ASILGDAIEY LKELQQKIRD INKELESTLP GSSLAPTPTS 420 SFHPLTPTAT ALTSRIKDEI CPSSLPSPNG QPAKVEVRIR EGRAVNIHMF CGRRPGLLLS 480 TMRALDNLGL DIQQAVISCF NGFAMDIFRA E |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5gnj_A | 4e-14 | 347 | 404 | 6 | 63 | Transcription factor MYC2 |
| 5gnj_B | 4e-14 | 347 | 404 | 6 | 63 | Transcription factor MYC2 |
| 5gnj_E | 4e-14 | 347 | 404 | 6 | 63 | Transcription factor MYC2 |
| 5gnj_F | 4e-14 | 347 | 404 | 6 | 63 | Transcription factor MYC2 |
| 5gnj_G | 4e-14 | 347 | 404 | 6 | 63 | Transcription factor MYC2 |
| 5gnj_I | 4e-14 | 347 | 404 | 6 | 63 | Transcription factor MYC2 |
| 5gnj_M | 4e-14 | 347 | 404 | 6 | 63 | Transcription factor MYC2 |
| 5gnj_N | 4e-14 | 347 | 404 | 6 | 63 | Transcription factor MYC2 |
| Search in ModeBase | ||||||
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 341 | 359 | KRKGMPAKNLMAERRRRKK |
| 2 | 353 | 360 | ERRRRKKL |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_1024.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021897166.1 | 0.0 | transcription factor ICE1-like | ||||
| TrEMBL | A0A1W6E001 | 0.0 | A0A1W6E001_HEVBR; ICE-like protein 1 | ||||
| STRING | evm.model.supercontig_1024.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1952 | 27 | 82 | Representative plant | OGRP557 | 16 | 78 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G26744.4 | 1e-116 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_1024.1 |