![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_109.22 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 662aa MW: 73050.5 Da PI: 6.4165 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 58.9 | 8.6e-19 | 17 | 75 | 3 | 57 |
--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHC....TS-HHHHHHHHHHHHHHHHC CS
Homeobox 3 kRttftkeqleeLeelFeknrypsaeereeLAkkl....gLterqVkvWFqNrRakekk 57
k ++t+eq+e+Le+l++++++ps +r++L +++ +++ +q+kvWFqNrR +ek+
evm.model.supercontig_109.22 17 KYVRYTPEQVEALERLYHECPKPSSIRRQQLIRECpilsNIEPKQIKVWFQNRRCREKQ 75
5679*****************************************************97 PP
| |||||||
| 2 | START | 86.7 | 5e-28 | 161 | 285 | 2 | 124 |
HHHHHHHHHHHHHHHC-TT-EEEEEXCCTTEEEEEEESSS.SCEEEEEEEECCSCHHHHHHHHHCCCGGCT-TT-SEEEEE CS
START 2 laeeaaqelvkkalaeepgWvkssesengdevlqkfeeskvdsgealrasgvvdmvlallveellddkeqWdetlakaetl 82
+aee+++e+++ka+ ++ Wv+++ +++g++++ +++ s++++g a+ra+g+v +++ v+e+l+d++ W ++++++++l
evm.model.supercontig_109.22 161 IAEETLAEFLSKATGTAVEWVQMPGMKPGPDSIGIVAISHGCTGVAARACGLVGLEPT-RVAEILKDRPSWFRDCRAVDVL 240
7899******************************************************.8888888888************ PP
EEECTT..EEEEEEEEXXTTXX-SSX.EEEEEEEEEEE.TTS-EE CS
START 83 evissg..galqlmvaelqalsplvp.RdfvfvRyirqlgagdwv 124
+v+ ++ g+++l +++l+a+++l+p Rdf+ +Ry+ l++g+++
evm.model.supercontig_109.22 241 NVLPTAngGTIELLYMQLYAPTTLAPaRDFWLLRYTSVLEDGSLA 285
****9999*******************************999987 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50071 | 15.758 | 12 | 76 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 1.2E-15 | 14 | 80 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 6.09E-17 | 17 | 77 | No hit | No description |
| SuperFamily | SSF46689 | 4.71E-17 | 17 | 80 | IPR009057 | Homeodomain-like |
| Pfam | PF00046 | 2.2E-16 | 18 | 75 | IPR001356 | Homeobox domain |
| Gene3D | G3DSA:1.10.10.60 | 1.2E-18 | 19 | 75 | IPR009057 | Homeodomain-like |
| CDD | cd14686 | 8.48E-7 | 69 | 108 | No hit | No description |
| PROSITE profile | PS50848 | 11.543 | 151 | 282 | IPR002913 | START domain |
| SuperFamily | SSF55961 | 2.06E-17 | 152 | 284 | No hit | No description |
| SMART | SM00234 | 6.1E-4 | 160 | 363 | IPR002913 | START domain |
| Gene3D | G3DSA:3.30.530.20 | 1.1E-7 | 160 | 284 | IPR023393 | START-like domain |
| Pfam | PF01852 | 5.7E-25 | 161 | 285 | IPR002913 | START domain |
| Pfam | PF08670 | 4.4E-53 | 518 | 660 | IPR013978 | MEKHLA |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0008289 | Molecular Function | lipid binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 662 aa Download sequence Send to blast |
MAMSCKDGKL GNMDNGKYVR YTPEQVEALE RLYHECPKPS SIRRQQLIRE CPILSNIEPK 60 QIKVWFQNRR CREKQRKEAS RLQAVNRKLT AMNKLLMEEN DRLQKQVSQL VYENGYFRQH 120 TQNTTLATKD TSCESVVTSG QHHLTPQHPP RDASPAGLLS IAEETLAEFL SKATGTAVEW 180 VQMPGMKPGP DSIGIVAISH GCTGVAARAC GLVGLEPTRV AEILKDRPSW FRDCRAVDVL 240 NVLPTANGGT IELLYMQLYA PTTLAPARDF WLLRYTSVLE DGSLANVPPA ILLRFLREHR 300 SEWADNNIDA YSAAAVKVGP YSIPGSRVGG FGGQVILPLA HTIEHEEFLE VIKLEGVGHS 360 PEDTIIPRDV FLLQLCSGMD ENAVGSCAEL IFAPIDASFA DDAPLLPSGF RIIPLDSGKE 420 TSSPNRTLDL ASALEIGPAG NKASNDYSGN SNCTRSVMTI AFEFAFESHM QEHVASMARQ 480 YVRSIISSVQ RVALALSPSH LSSHAGLRTP LGTPEAQTLA RWICQSYRCY LGVELLKSSN 540 EGSETILKTL WHHSDAIMCC SLKALPVFTF ANQAGLDMLE TTLVALQDIT LEKIFDDHGR 600 KTLCSEFPQI MQQGFAYLQG GICLSSMGRP VSYEKAVAWK VLNEEENAHC VCFMFVNWSF 660 V* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor involved in the regulation of meristem development to promote lateral organ formation. May regulates procambial and vascular tissue formation or maintenance, and vascular development in inflorescence stems. {ECO:0000269|PubMed:15598805, ECO:0000269|PubMed:15705957, ECO:0000269|PubMed:16617092}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_109.22 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: By auxin. Repressed by miR165 and miR166. {ECO:0000269|PubMed:15773855, ECO:0000269|PubMed:16033795, ECO:0000269|PubMed:16617092, ECO:0000269|PubMed:17237362}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021891939.1 | 0.0 | homeobox-leucine zipper protein ATHB-15 | ||||
| Swissprot | Q9ZU11 | 0.0 | ATB15_ARATH; Homeobox-leucine zipper protein ATHB-15 | ||||
| TrEMBL | A0A0V0IVI9 | 0.0 | A0A0V0IVI9_SOLCH; Putative homeobox-leucine zipper protein ATHB-14-like | ||||
| STRING | evm.model.supercontig_109.22 | 0.0 | (Carica papaya) | ||||
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G52150.1 | 0.0 | HD-ZIP family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_109.22 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




