![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_109.50 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | M-type_MADS | ||||||||
| Protein Properties | Length: 70aa MW: 7798.08 Da PI: 10.6116 | ||||||||
| Description | M-type_MADS family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | SRF-TF | 49.8 | 4.5e-16 | 6 | 50 | 5 | 49 |
SHHHHHHHHHHHHHHHHHHHHHHHHHHT-EEEEEEE-TTSEEEEE CS
SRF-TF 5 nksnrqvtfskRrngilKKAeELSvLCdaevaviifsstgklyey 49
++s qvtf kRr+g +KKA+EL++L +++a+iif ++ k++ +
evm.model.supercontig_109.50 6 SESSLQVTFFKRRAGPFKKANELCTLSRTDIAIIIFLPSRKVFSF 50
67788*******************************999999877 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00432 | 1.3E-11 | 1 | 53 | IPR002100 | Transcription factor, MADS-box |
| PROSITE profile | PS50066 | 15.979 | 1 | 54 | IPR002100 | Transcription factor, MADS-box |
| SuperFamily | SSF55455 | 8.37E-17 | 3 | 66 | IPR002100 | Transcription factor, MADS-box |
| Pfam | PF00319 | 1.5E-17 | 4 | 50 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 7.7E-6 | 16 | 31 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 7.7E-6 | 31 | 52 | IPR002100 | Transcription factor, MADS-box |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 70 aa Download sequence Send to blast |
MVKMNSESSL QVTFFKRRAG PFKKANELCT LSRTDIAIII FLPSRKVFSF GHPSVETVVE 60 HFISSNPPQ* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor. Required for suppression of cellularization and promotion of nuclear proliferation during early endosperm development. The FERTILIZATION-INDEPENDENT SEED (FIS) polycomb complex is required for suppression of ALG62 expression at the end of the syncytial phase of endosperm development. {ECO:0000269|PubMed:18334668}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_109.50 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021892299.1 | 2e-32 | agamous-like MADS-box protein AGL62 | ||||
| Swissprot | Q9FKK2 | 2e-25 | AGL62_ARATH; Agamous-like MADS-box protein AGL62 | ||||
| TrEMBL | A0A067KZE0 | 2e-26 | A0A067KZE0_JATCU; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_109.50 | 2e-43 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM86 | 28 | 390 | Representative plant | OGRP16 | 17 | 761 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G60440.1 | 1e-27 | AGAMOUS-like 62 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_109.50 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




