![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_12.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 523aa MW: 56992.8 Da PI: 6.8038 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 17.4 | 7.8e-06 | 359 | 397 | 11 | 54 |
HHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHH CS
HLH 11 rRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksL 54
R +++ +++ L++l+ + +K + a++L +A+eYIk L
evm.model.supercontig_12.1 359 VRKEKMGDRITALQQLVSPF-----GKTDTASVLSEAIEYIKFL 397
5778999**********998.....8****************98 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 12.874 | 348 | 397 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 7.80E-7 | 358 | 401 | No hit | No description |
| SuperFamily | SSF47459 | 2.62E-11 | 358 | 410 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 0.0049 | 359 | 403 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 2.9E-9 | 362 | 405 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 523 aa Download sequence Send to blast |
MADEFNTSTN WWDSSRNRFD SGSSSSSSGI NSLGGSFGWP TEMVDIKARS SMDSVSVSGS 60 SVVFQDTQKL QGSDSGGDHL HMMGLGLSSP AMDWNQALLR GDKAEPSFRS LLQDSNSTTP 120 YHQQEIGHMG SSSTTTSSQV QWREKMFAGG VSSGDSSSAN EFKQLNRGFS LDQSQFSPHG 180 SSSDSTVTCQ GLPSSFQIDN SAGIYGSQAS SILQGLLGSD NQPPPQPQPS SFENRALNYN 240 QYTNYAMNPN ELMANSWPKI PQFLRNSPPK QPSHSHLHFS NNAPFWNAPA TAMNDVRSSF 300 FPSLQPQFSN PNFEEKPKNI SEVRESSSVV KKNGSESSNP ASNKRARSET ASPLPAFKVR 360 KEKMGDRITA LQQLVSPFGK TDTASVLSEA IEYIKFLHEQ VTVLSTPYMK SGAASLQHQQ 420 QQSSEKSLKV DSDHQGPKQD LRSRGLCLVP VSSTFPVTHE TTVDFWTPTF GGTFRSEQKT 480 YRRLMGNSKE EDNPSKRENG IVGPASGMMM MMQDFGAAVM GP* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_12.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021905804.1 | 0.0 | transcription factor bHLH123 isoform X2 | ||||
| Swissprot | Q8GXT3 | 8e-97 | BH123_ARATH; Transcription factor bHLH123 | ||||
| TrEMBL | A0A2I4H7L4 | 0.0 | A0A2I4H7L4_JUGRE; transcription factor bHLH123-like isoform X2 | ||||
| STRING | evm.model.supercontig_12.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4024 | 25 | 53 | Representative plant | OGRP3135 | 11 | 29 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G20640.1 | 3e-70 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_12.1 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




