![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_124.41 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 187aa MW: 21200.2 Da PI: 9.2005 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 34.1 | 5e-11 | 14 | 64 | 6 | 54 |
HHHHHHHHHHHHHHHHHHHCTSCC.C...TTS-.STCHHHHHHHHHHHHHH CS
HLH 6 nerErrRRdriNsafeeLrellPk.askapskK.lsKaeiLekAveYIksL 54
+ +Er+RR +++s ++L +l+P+ +ka +k ls e Le+A YIk+L
evm.model.supercontig_124.41 14 KTVERNRRIHMKSLCFKLSSLIPSqHFKACDKEhLSQQEQLEHAATYIKEL 64
679*********************8888888888***************99 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| CDD | cd00083 | 6.85E-6 | 8 | 69 | No hit | No description |
| PROSITE profile | PS50888 | 10.671 | 8 | 64 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 3.53E-10 | 12 | 79 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 4.3E-11 | 12 | 79 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 1.0E-7 | 14 | 64 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 187 aa Download sequence Send to blast |
MKKRSSDSSK LDRKTVERNR RIHMKSLCFK LSSLIPSQHF KACDKEHLSQ QEQLEHAATY 60 IKELRERIEE LKGRKEEAIM EESGRGKYRS NINDGGLSLP MVELRDMGSS IEVNVISGLN 120 KNFMSYQVIR ILQEEGADVV SASFNTVGDK IFHTFHAQVK ITRVGVETSR VSQRLEEMIC 180 LGSANI* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_124.41 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021890867.1 | 1e-135 | transcription factor bHLH162-like | ||||
| TrEMBL | A0A2C9VR57 | 1e-75 | A0A2C9VR57_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_124.41 | 1e-134 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1278 | 25 | 92 | Representative plant | OGRP1345 | 11 | 47 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G20970.1 | 8e-23 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_124.41 |




