![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_1246.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 306aa MW: 34216.1 Da PI: 6.7836 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 60.3 | 3e-19 | 154 | 208 | 2 | 56 |
T--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHH CS
Homeobox 2 rkRttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakek 56
rk+ +++k+q +Le+ F+ + +++ ++++ LA++l+L rqV vWFqNrRa+ k
evm.model.supercontig_1246.1 154 RKKLRLSKQQAAILEDSFRDHTTLNPKQKQALAEQLNLRPRQVEVWFQNRRARTK 208
788899***********************************************98 PP
| |||||||
| 2 | HD-ZIP_I/II | 121 | 6.2e-39 | 154 | 242 | 1 | 90 |
HD-ZIP_I/II 1 ekkrrlskeqvklLEesFeeeekLeperKvelareLglqprqvavWFqnrRARtktkqlEkdyeaLkraydalkeenerLe 81
+kk+rlsk+q+++LE+sF+ +++L+p++K++la++L+l+prqv+vWFqnrRARtk+k++E+d+e Lk+++++l+een+rL+
evm.model.supercontig_1246.1 154 RKKLRLSKQQAAILEDSFRDHTTLNPKQKQALAEQLNLRPRQVEVWFQNRRARTKLKKTEVDCELLKKCCETLTEENKRLQ 234
69******************************************************************************* PP
HD-ZIP_I/II 82 keveeLree 90
kev+eL+ +
evm.model.supercontig_1246.1 235 KEVQELK-S 242
******9.4 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.10.10.60 | 1.3E-18 | 134 | 208 | IPR009057 | Homeodomain-like |
| SuperFamily | SSF46689 | 4.28E-18 | 136 | 211 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 17.07 | 150 | 210 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 5.7E-16 | 152 | 214 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 7.05E-16 | 153 | 211 | No hit | No description |
| Pfam | PF00046 | 1.5E-16 | 154 | 208 | IPR001356 | Homeobox domain |
| PROSITE pattern | PS00027 | 0 | 185 | 208 | IPR017970 | Homeobox, conserved site |
| SMART | SM00340 | 4.9E-22 | 210 | 253 | IPR003106 | Leucine zipper, homeobox-associated |
| Pfam | PF02183 | 2.0E-8 | 210 | 243 | IPR003106 | Leucine zipper, homeobox-associated |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 306 aa Download sequence Send to blast |
MVFSSDTDQN PTCDTGLGLA LCGRHERPNQ ENIKKNITLL ASLRYDDHLL PSDLSLGLKS 60 QDHHHVNQMV DDHRAGEASI GDVKDQVQQN QASSLSTEGV SSFSNSNSVK KETREYCNSG 120 SEEVEVEKIN YCSRVSSDDQ HEDHNHDQED GSPRKKLRLS KQQAAILEDS FRDHTTLNPK 180 QKQALAEQLN LRPRQVEVWF QNRRARTKLK KTEVDCELLK KCCETLTEEN KRLQKEVQEL 240 KSLKLTASFY MHLPAATLMT MCPSCERLGS STHGGDGSSG NPLIPISPKP HHLYNSFSHP 300 PSAAC* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor. {ECO:0000250}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_1246.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021894218.1 | 0.0 | homeobox-leucine zipper protein HAT22-like | ||||
| Swissprot | P46604 | 1e-70 | HAT22_ARATH; Homeobox-leucine zipper protein HAT22 | ||||
| TrEMBL | A0A2C9VXJ5 | 3e-84 | A0A2C9VXJ5_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_1246.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1671 | 28 | 86 | Representative plant | OGRP196 | 16 | 156 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G37790.1 | 1e-66 | HD-ZIP family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_1246.1 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




