![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_1288.2 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 384aa MW: 41171.9 Da PI: 6.8709 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 59.4 | 8.8e-19 | 71 | 120 | 2 | 55 |
AP2 2 gykGVrwdkkrgrWvAeIrdpsengkrkrfslgkfgtaeeAakaaiaarkkleg 55
+y+GVr+++ +g+WvAeIr+p++ r+r +lg+f taeeAa+a+++a++ l+g
evm.model.supercontig_1288.2 71 RYRGVRQRS-WGKWVAEIREPRK---RTRKWLGTFSTAEEAARAYDRAALILYG 120
59****999.**********954...5**********************98876 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS51032 | 22.774 | 71 | 128 | IPR001471 | AP2/ERF domain |
| CDD | cd00018 | 1.09E-31 | 71 | 128 | No hit | No description |
| SuperFamily | SSF54171 | 5.04E-21 | 71 | 128 | IPR016177 | DNA-binding domain |
| Pfam | PF00847 | 8.5E-13 | 71 | 118 | IPR001471 | AP2/ERF domain |
| SMART | SM00380 | 2.2E-37 | 71 | 134 | IPR001471 | AP2/ERF domain |
| Gene3D | G3DSA:3.30.730.10 | 1.0E-29 | 71 | 128 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 1.2E-10 | 72 | 83 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 1.2E-10 | 94 | 110 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006970 | Biological Process | response to osmotic stress | ||||
| GO:0009414 | Biological Process | response to water deprivation | ||||
| GO:0009738 | Biological Process | abscisic acid-activated signaling pathway | ||||
| GO:0009744 | Biological Process | response to sucrose | ||||
| GO:0009749 | Biological Process | response to glucose | ||||
| GO:0010119 | Biological Process | regulation of stomatal movement | ||||
| GO:0010353 | Biological Process | response to trehalose | ||||
| GO:0010449 | Biological Process | root meristem growth | ||||
| GO:0010896 | Biological Process | regulation of triglyceride catabolic process | ||||
| GO:0031930 | Biological Process | mitochondria-nucleus signaling pathway | ||||
| GO:0032880 | Biological Process | regulation of protein localization | ||||
| GO:0045893 | Biological Process | positive regulation of transcription, DNA-templated | ||||
| GO:0048316 | Biological Process | seed development | ||||
| GO:0048527 | Biological Process | lateral root development | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| GO:0044212 | Molecular Function | transcription regulatory region DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 384 aa Download sequence Send to blast |
MEPPLPPPEP NNTTDTKSSD TTTSDNTTNT TNTTKNEDTV AKNDTTNSGS SGSSSTRRCK 60 GKGGPDNSKF RYRGVRQRSW GKWVAEIREP RKRTRKWLGT FSTAEEAARA YDRAALILYG 120 SRAQLNLQPS GSTSSSSSSS RGGSASSSST TSSTQTLRPL LPRPSAFAFT FSSASSTSTL 180 LMSTQHALQT PVAAELAASS SGFMPFGAYQ NVVVGGSSAA LLCPSMVMTS TSTATTQLPV 240 FYQHYLQHHH HQYLPSDQIN VGDISTHYHH HGPTSATTSY NQNPTPHRHH HHHQPQQQEE 300 QEGCVFDVNS LVGSVDSSLS LSTQSAEAVI APPPLPPANP DPGFSVGHGS TPVWPLTGSA 360 EDDYPPCSIW DYPDPFGFLD LDF* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 1gcc_A | 5e-18 | 72 | 127 | 3 | 59 | ETHYLENE RESPONSIVE ELEMENT BINDING FACTOR 1 |
| Search in ModeBase | ||||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00674 | SELEX | Transfer from GRMZM2G093595 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_1288.2 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021893802.1 | 0.0 | ethylene-responsive transcription factor ABI4 | ||||
| TrEMBL | A0A067FZN0 | 2e-72 | A0A067FZN0_CITSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_1288.2 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM10552 | 24 | 33 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G40220.1 | 8e-34 | ERF family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_1288.2 |




