![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_131.83 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 227aa MW: 23829.4 Da PI: 9.7669 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 65.6 | 1e-20 | 22 | 72 | 2 | 56 |
AP2 2 gykGVrwdkkrgrWvAeIrdpsengkrkrfslgkfgtaeeAakaaiaarkklege 56
+y+GVr ++ +gr++AeIrdp gk++r++lg+f+taeeAa+a++aa+++++g+
evm.model.supercontig_131.83 22 RYRGVRKRP-WGRYAAEIRDP---GKKTRVWLGTFDTAEEAARAYDAAAREFRGA 72
59*******.**********8...557*************************985 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| CDD | cd00018 | 1.10E-18 | 22 | 81 | No hit | No description |
| Pfam | PF00847 | 1.6E-14 | 22 | 71 | IPR001471 | AP2/ERF domain |
| SMART | SM00380 | 2.2E-37 | 22 | 85 | IPR001471 | AP2/ERF domain |
| SuperFamily | SSF54171 | 9.15E-23 | 22 | 80 | IPR016177 | DNA-binding domain |
| Gene3D | G3DSA:3.30.730.10 | 1.2E-32 | 22 | 80 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 24.513 | 22 | 79 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 1.0E-11 | 23 | 34 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 1.0E-11 | 45 | 61 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009723 | Biological Process | response to ethylene | ||||
| GO:0009737 | Biological Process | response to abscisic acid | ||||
| GO:0009864 | Biological Process | induced systemic resistance, jasmonic acid mediated signaling pathway | ||||
| GO:0010200 | Biological Process | response to chitin | ||||
| GO:0045892 | Biological Process | negative regulation of transcription, DNA-templated | ||||
| GO:0016604 | Cellular Component | nuclear body | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 227 aa Download sequence Send to blast |
MAPREKLQPV AANPNPNSKE IRYRGVRKRP WGRYAAEIRD PGKKTRVWLG TFDTAEEAAR 60 AYDAAAREFR GAKAKTNFPT VAELNNNNNG GANNSNSFTR SPSQSSTVES ASPPPPPQLE 120 LSLGGGGGVG PCFPLPVVAR PVFLYDVTPR GGCGAGVTGA RVSRDACRFD RTVSGFQLAP 180 MRGNASGVSG GTQSDSDSSS VVDYDGGAGR RSFHDFDLNL PAAEVA* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5wx9_A | 9e-21 | 22 | 79 | 14 | 72 | Ethylene-responsive transcription factor ERF096 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Acts as a transcriptional repressor. Binds to the GCC-box pathogenesis-related promoter element. Involved in the regulation of gene expression by stress factors and by components of stress signal transduction pathways, and could also regulate other AtERFs. {ECO:0000269|PubMed:10715325, ECO:0000269|PubMed:11487705, ECO:0000269|PubMed:9756931}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00358 | DAP | Transfer from AT3G15210 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_131.83 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Induced by jasmonate (JA) and by Alternaria brassicicola (locally and systemically), but only slightly by ethylene. Strong induction by wounding, cold or drought stress does not require EIN2, whereas induction by NaCl does. Transcripts accumulate in cycloheximide-treated plants, a protein synthesis inhibitor. Seems to not be influenced by exogenous abscisic acid (ABA), and heat stress. {ECO:0000269|PubMed:10715325, ECO:0000269|PubMed:12805630}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021890293.1 | 1e-163 | ethylene-responsive transcription factor 4 | ||||
| Swissprot | O80340 | 1e-52 | ERF78_ARATH; Ethylene-responsive transcription factor 4 | ||||
| TrEMBL | D7L402 | 7e-56 | D7L402_ARALL; ATERF-4/ATERF4/ERF4/RAP2.5 | ||||
| STRING | evm.model.supercontig_131.83 | 1e-163 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM10 | 28 | 1650 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G15210.1 | 6e-32 | ethylene responsive element binding factor 4 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_131.83 |




