![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_132.31 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 229aa MW: 25322.2 Da PI: 9.986 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 61.5 | 1.9e-19 | 31 | 79 | 3 | 55 |
AP2 3 ykGVrwdkkrgrWvAeIrd.psengkrkrfslgkfgtaeeAakaaiaarkkleg 55
++GVr ++ +gr++AeIrd ++ ++r++lg+f++ae+Aa+a++aa+++++g
evm.model.supercontig_132.31 31 FRGVRKRP-WGRFAAEIRDpWK----KTRVWLGTFDSAEDAARAYDAAARSFRG 79
8*******.**********883....5************************998 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF00847 | 2.9E-12 | 30 | 79 | IPR001471 | AP2/ERF domain |
| CDD | cd00018 | 1.40E-17 | 30 | 89 | No hit | No description |
| SMART | SM00380 | 7.7E-38 | 30 | 93 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 23.459 | 30 | 87 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 2.8E-10 | 31 | 42 | IPR001471 | AP2/ERF domain |
| SuperFamily | SSF54171 | 7.19E-22 | 31 | 88 | IPR016177 | DNA-binding domain |
| Gene3D | G3DSA:3.30.730.10 | 2.2E-31 | 31 | 88 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 2.8E-10 | 53 | 69 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 229 aa Download sequence Send to blast |
MRRGRATTKQ TDLTAKPIAP DSTNAVKEIR FRGVRKRPWG RFAAEIRDPW KKTRVWLGTF 60 DSAEDAARAY DAAARSFRGP KAKTNFPTTQ SSSIPPPVYP QYQGHNRHHR HPQEDGGFSK 120 YEPVQVNRPT SSSMSSTVES FSGPRIAVSA SAVAPRAHKR RPVQQPPLQP DDCHSDCDSS 180 SSVVDDDDCV LTSSFRTVFP FDLNLPPPQT THPVDFSGDD LHATALRL* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5wx9_A | 2e-19 | 30 | 87 | 14 | 72 | Ethylene-responsive transcription factor ERF096 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor that binds to the GCC-box pathogenesis-related promoter element. Involved in the regulation of gene expression by stress factors and by components of stress signal transduction pathways. Probably acts as a transcriptional repressor and may regulate other AtERFs (By similarity). {ECO:0000250}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_132.31 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021890173.1 | 1e-167 | ethylene-responsive transcription factor 3-like | ||||
| Swissprot | Q9SXS8 | 6e-46 | ERF3_TOBAC; Ethylene-responsive transcription factor 3 | ||||
| TrEMBL | A0A0V0HV08 | 1e-72 | A0A0V0HV08_SOLCH; Putative ethylene-responsive transcription factor 3-like | ||||
| STRING | evm.model.supercontig_132.31 | 1e-167 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM10 | 28 | 1650 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G50640.1 | 7e-31 | ethylene responsive element binding factor 3 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_132.31 |




