![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_132.63 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | B3 | ||||||||
| Protein Properties | Length: 432aa MW: 49149.7 Da PI: 10.4023 | ||||||||
| Description | B3 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | B3 | 39.7 | 8.6e-13 | 332 | 407 | 1 | 80 |
EEEE-..-HHHHTT-E.E--HHH.HTT---..--SEEEEEETTS-EEEEEE..EEETTEEEE-TTHHHHHHHHT--TT-EE CS
B3 1 ffkvltpsdvlksgrl.vlpkkfaeehggkkeesktltledesgrsWevkliyrkksgryvltkGWkeFvkangLkegDfv 80
ff v ++++ +k++++ +p fa+eh +k+ ++ + sW vkl +++gr+++++GW F+++n L++gD++
evm.model.supercontig_132.63 332 FFMVVISPHCFKHHCVqHIPAGFAKEHIKKHD---ICSIVETADGSWAVKL--INSGGRFTFSAGWAVFARENSLQQGDVC 407
666777888888865559*********54433...3566678889******..9**************************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:2.40.330.10 | 9.3E-6 | 17 | 74 | IPR015300 | DNA-binding pseudobarrel domain |
| SuperFamily | SSF101936 | 1.02E-5 | 20 | 74 | IPR015300 | DNA-binding pseudobarrel domain |
| Gene3D | G3DSA:2.40.330.10 | 1.2E-13 | 154 | 248 | IPR015300 | DNA-binding pseudobarrel domain |
| SuperFamily | SSF101936 | 1.06E-16 | 155 | 248 | IPR015300 | DNA-binding pseudobarrel domain |
| CDD | cd10017 | 4.02E-13 | 160 | 246 | No hit | No description |
| SMART | SM01019 | 1.2E-4 | 162 | 248 | IPR003340 | B3 DNA binding domain |
| PROSITE profile | PS50863 | 8.557 | 205 | 248 | IPR003340 | B3 DNA binding domain |
| SuperFamily | SSF101936 | 3.73E-7 | 254 | 294 | IPR015300 | DNA-binding pseudobarrel domain |
| Gene3D | G3DSA:2.40.330.10 | 2.9E-6 | 258 | 295 | IPR015300 | DNA-binding pseudobarrel domain |
| PROSITE profile | PS50863 | 8.205 | 260 | 295 | IPR003340 | B3 DNA binding domain |
| Gene3D | G3DSA:2.40.330.10 | 1.6E-13 | 328 | 408 | IPR015300 | DNA-binding pseudobarrel domain |
| SuperFamily | SSF101936 | 4.9E-15 | 328 | 407 | IPR015300 | DNA-binding pseudobarrel domain |
| CDD | cd10017 | 3.03E-10 | 331 | 407 | No hit | No description |
| Pfam | PF02362 | 9.5E-10 | 332 | 407 | IPR003340 | B3 DNA binding domain |
| SMART | SM01019 | 2.6E-6 | 333 | 421 | IPR003340 | B3 DNA binding domain |
| PROSITE profile | PS50863 | 9.573 | 333 | 431 | IPR003340 | B3 DNA binding domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 432 aa Download sequence Send to blast |
MAVSGRKQRV FFQLKFTAEE LHFFEIILQD SLRDGKLKIP EKFWGKFGNG IPGSVKLVAP 60 CGAVWRVGVT KSDREASGPR EVGSKEKPCR KRKDKSTLPC PKPSKSLKTY SASEKVRDRH 120 EGLFSDGFRQ GKVPKGVEPL AADEESKALQ RAMAFKSNNP LFLIVMQPSY IDSEYPLKIP 180 VWFVKKYLTE KHREVILQIL DGRKTDGRFY CKWKAFAEIN KLEVGDVCVF ELFNRTQPLF 240 NVIIYRNNDR PNCSRSQDRW RAFVQGNNLK VGDTCFFKLI RGPKTMFNVD IKRATGDANH 300 GLTTRYEGSE KTRKHSSQAT ASGRKFVSKY PFFMVVISPH CFKHHCVQHI PAGFAKEHIK 360 KHDICSIVET ADGSWAVKLI NSGGRFTFSA GWAVFARENS LQQGDVCAGN LMKMINTFGN 420 DQKHRIFEFR F* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 4i1k_A | 3e-14 | 312 | 413 | 28 | 129 | B3 domain-containing transcription factor VRN1 |
| 4i1k_B | 3e-14 | 312 | 413 | 28 | 129 | B3 domain-containing transcription factor VRN1 |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 89 | 94 | RKRKDK |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_132.63 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021890131.1 | 1e-132 | B3 domain-containing transcription factor VRN1-like | ||||
| STRING | evm.model.supercontig_132.63 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM16925 | 5 | 12 | Representative plant | OGRP1718 | 5 | 38 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G18990.1 | 6e-15 | B3 family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_132.63 |




