![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_1332.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | CO-like | ||||||||
| Protein Properties | Length: 342aa MW: 37099.3 Da PI: 6.5024 | ||||||||
| Description | CO-like family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-B_box | 26.5 | 1.3e-08 | 4 | 36 | 4 | 36 |
zf-B_box 4 rkCpeHeekelqlfCedCqqllCedClleeHkg 36
+ C+ +++ ++lfC+ ++ +lC +C ++ H
evm.model.supercontig_1332.1 4 KLCDSCKSATATLFCRADSAFLCVNCDSKVHAA 36
58***************************9954 PP
| |||||||
| 2 | zf-B_box | 27.7 | 5.5e-09 | 46 | 91 | 3 | 42 |
zf-B_box 3 erkCpeHeekelqlfCedCqqllCedClleeHkg......Htvvpl 42
++C+ +e+ +++ C+ + lC +C +H+ H++vp+
evm.model.supercontig_1332.1 46 VWVCEVCEQAPAHVTCKADAAALCVTCDRDIHSAnplarrHERVPV 91
689*****************************66899999*99986 PP
| |||||||
| 3 | CCT | 69.3 | 9.6e-24 | 278 | 321 | 1 | 44 |
CCT 1 ReaallRYkeKrktRkFeKkirYesRKavAesRpRvKGrFvkqa 44
Rea++lRY+eKrk+RkFeK+irY+sRKa+Ae RpR+KGrF+k++
evm.model.supercontig_1332.1 278 REARVLRYREKRKNRKFEKTIRYASRKAYAEMRPRIKGRFAKRT 321
9*****************************************97 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50119 | 10.865 | 1 | 48 | IPR000315 | B-box-type zinc finger |
| SMART | SM00336 | 9.2E-15 | 1 | 48 | IPR000315 | B-box-type zinc finger |
| Pfam | PF00643 | 1.3E-6 | 4 | 43 | IPR000315 | B-box-type zinc finger |
| CDD | cd00021 | 2.54E-10 | 5 | 48 | No hit | No description |
| PROSITE profile | PS50119 | 10.893 | 44 | 91 | IPR000315 | B-box-type zinc finger |
| Pfam | PF00643 | 2.4E-7 | 46 | 91 | IPR000315 | B-box-type zinc finger |
| CDD | cd00021 | 1.48E-9 | 47 | 91 | No hit | No description |
| SMART | SM00336 | 1.3E-10 | 49 | 91 | IPR000315 | B-box-type zinc finger |
| PROSITE profile | PS51017 | 16.658 | 278 | 320 | IPR010402 | CCT domain |
| Pfam | PF06203 | 1.5E-17 | 278 | 320 | IPR010402 | CCT domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0005622 | Cellular Component | intracellular | ||||
| GO:0005515 | Molecular Function | protein binding | ||||
| GO:0008270 | Molecular Function | zinc ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 342 aa Download sequence Send to blast |
MASKLCDSCK SATATLFCRA DSAFLCVNCD SKVHAANKLA SRHARVWVCE VCEQAPAHVT 60 CKADAAALCV TCDRDIHSAN PLARRHERVP VTPFYDSVAS APGAVKPNAA ATAVNFLDDR 120 YFSDVDGDAD VSREEAEAAS WLLPNPNSKA VAASPDLNTG QFMFSDMDPY LDLDYGPVDP 180 KLEAQEQNSS GTDGVVPVQS RSVQAPLVNE HCFDLDFGAS KYFPYGYNGH SLSHSVSSSS 240 VDVGVVPDGG SMADITNPYS RGAESGNQTA AQLSSADREA RVLRYREKRK NRKFEKTIRY 300 ASRKAYAEMR PRIKGRFAKR TDIEVDADRN SIYGFGIVPT F* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_1332.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021893456.1 | 0.0 | zinc finger protein CONSTANS-LIKE 4 | ||||
| Swissprot | Q940T9 | 1e-162 | COL4_ARATH; Zinc finger protein CONSTANS-LIKE 4 | ||||
| TrEMBL | A0A061GJE1 | 0.0 | A0A061GJE1_THECC; CONSTANS-like 4 | ||||
| STRING | evm.model.supercontig_1332.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM2760 | 27 | 65 | Representative plant | OGRP691 | 17 | 67 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G24930.1 | 1e-158 | CONSTANS-like 4 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_1332.1 |




