![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_1379.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 311aa MW: 35540.5 Da PI: 4.4532 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 58.1 | 1.4e-18 | 84 | 138 | 3 | 57 |
--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHHC CS
Homeobox 3 kRttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakekk 57
k++++t++q++ Le+ Fe ++++ e++ +LAk+lgL+ rqV +WFqNrRa+ k+
evm.model.supercontig_1379.1 84 KKRRLTATQVQFLERSFEVENKLEPERKLQLAKELGLQPRQVAIWFQNRRARFKN 138
56689***********************************************995 PP
| |||||||
| 2 | HD-ZIP_I/II | 127.4 | 6.2e-41 | 84 | 174 | 2 | 92 |
HD-ZIP_I/II 2 kkrrlskeqvklLEesFeeeekLeperKvelareLglqprqvavWFqnrRARtktkqlEkdyeaLkraydalkeenerLek 82
kkrrl++ qv++LE+sFe e+kLeperK +la+eLglqprqva+WFqnrRAR+k+kqlE+dy++Lk+++d+lk+++++L k
evm.model.supercontig_1379.1 84 KKRRLTATQVQFLERSFEVENKLEPERKLQLAKELGLQPRQVAIWFQNRRARFKNKQLERDYDSLKASFDKLKADHDKLLK 164
9******************************************************************************** PP
HD-ZIP_I/II 83 eveeLreelk 92
e+e+L++el
evm.model.supercontig_1379.1 165 ENEALKQELV 174
******9986 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF46689 | 1.2E-19 | 72 | 141 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 17.119 | 79 | 139 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 8.8E-18 | 81 | 143 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 9.21E-17 | 82 | 140 | No hit | No description |
| Pfam | PF00046 | 4.9E-16 | 84 | 137 | IPR001356 | Homeobox domain |
| Gene3D | G3DSA:1.10.10.60 | 8.7E-20 | 86 | 147 | IPR009057 | Homeodomain-like |
| PRINTS | PR00031 | 6.5E-6 | 110 | 119 | IPR000047 | Helix-turn-helix motif |
| PROSITE pattern | PS00027 | 0 | 114 | 137 | IPR017970 | Homeobox, conserved site |
| PRINTS | PR00031 | 6.5E-6 | 119 | 135 | IPR000047 | Helix-turn-helix motif |
| Pfam | PF02183 | 8.1E-16 | 139 | 180 | IPR003106 | Leucine zipper, homeobox-associated |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 311 aa Download sequence Send to blast |
MAGIKVCGNP NMALFLQNEK LPSSPQLLES LWIPTSSNLH GSRSMVDFEK VTEGEAIDAG 60 FFQAMDREEN VDEDYDTCLN PPGKKRRLTA TQVQFLERSF EVENKLEPER KLQLAKELGL 120 QPRQVAIWFQ NRRARFKNKQ LERDYDSLKA SFDKLKADHD KLLKENEALK QELVSIQNKL 180 IHQDKMKEKN LEPADQEINL SNEDEPNLPL MMTLKQEDVS SAKSDVFDSD SPHYTDGNQS 240 SLGEPADSSH VFEADHSDFS QDEDDNNLSK SLLQPQWFLK MEGDSTYGHD DMAANSCSFV 300 FDQPIWSWLY * |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 131 | 139 | RRARFKNKQ |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_1379.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021893147.1 | 0.0 | homeobox-leucine zipper protein ATHB-54-like | ||||
| TrEMBL | A0A2N9EC56 | 1e-116 | A0A2N9EC56_FAGSY; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_1379.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM545 | 28 | 143 | Representative plant | OGRP129 | 16 | 189 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G01470.1 | 2e-38 | homeobox 1 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_1379.1 |




