![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_138.5 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | MYB | ||||||||
| Protein Properties | Length: 328aa MW: 34801 Da PI: 6.6028 | ||||||||
| Description | MYB family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Myb_DNA-binding | 33.5 | 9.9e-11 | 11 | 54 | 3 | 44 |
SS-HHHHHHHHHHHHHTTTT...-HHHHHHHHTTTS-HHHHHHHH CS
Myb_DNA-binding 3 rWTteEdellvdavkqlGgg...tWktIartmgkgRtlkqcksrw 44
+W+ e d+ + +a + ++ + +W++Ia ++ g+tl+++k+++
evm.model.supercontig_138.5 11 SWSREQDKAFENALATYPEDstdRWERIAGDVP-GKTLEEIKHHY 54
7********************************.**********9 PP
| |||||||
| 2 | Myb_DNA-binding | 39.3 | 1.5e-12 | 104 | 148 | 3 | 47 |
SS-HHHHHHHHHHHHHTTTT-HHHHHHHHTTTS-HHHHHHHHHHH CS
Myb_DNA-binding 3 rWTteEdellvdavkqlGggtWktIartmgkgRtlkqcksrwqky 47
+WT++E+ l++ + + G+g+W++I+r + +Rt+ q+ s+ qky
evm.model.supercontig_138.5 104 AWTEDEHRLFLLGLDKCGKGDWRSISRNFVVTRTPTQVASHAQKY 148
6*******************************************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS51293 | 7.21 | 7 | 62 | IPR017884 | SANT domain |
| SMART | SM00717 | 4.8E-8 | 8 | 60 | IPR001005 | SANT/Myb domain |
| Gene3D | G3DSA:1.10.10.60 | 9.3E-5 | 10 | 58 | IPR009057 | Homeodomain-like |
| SuperFamily | SSF46689 | 4.67E-11 | 10 | 66 | IPR009057 | Homeodomain-like |
| Pfam | PF00249 | 6.3E-8 | 11 | 54 | IPR001005 | SANT/Myb domain |
| CDD | cd00167 | 1.90E-8 | 11 | 54 | No hit | No description |
| PROSITE profile | PS51294 | 16.503 | 96 | 153 | IPR017930 | Myb domain |
| SuperFamily | SSF46689 | 1.36E-15 | 100 | 154 | IPR009057 | Homeodomain-like |
| SMART | SM00717 | 4.2E-9 | 101 | 151 | IPR001005 | SANT/Myb domain |
| TIGRFAMs | TIGR01557 | 9.2E-17 | 101 | 151 | IPR006447 | Myb domain, plants |
| Pfam | PF00249 | 1.5E-10 | 104 | 148 | IPR001005 | SANT/Myb domain |
| Gene3D | G3DSA:1.10.10.60 | 9.2E-10 | 104 | 147 | IPR009057 | Homeodomain-like |
| CDD | cd00167 | 7.34E-9 | 104 | 149 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 328 aa Download sequence Send to blast |
MTGDEAGGSS SWSREQDKAF ENALATYPED STDRWERIAG DVPGKTLEEI KHHYDLLVDD 60 VNRIESGCVP LPAYNSSEGS TSQAGDEGTG SKSRSDQEHR KGIAWTEDEH RLFLLGLDKC 120 GKGDWRSISR NFVVTRTPTQ VASHAQKYFL RLNSTNKDRR RSSIHDITSV GNGDISAPQG 180 PITGQTNVSV AGGCSGKSTK EPPQPPAGPP VVSMYGALTI DQPISGPLVS AVGAPVNLPA 240 PPHMAYGVRA PVPGAVVSGV PMNMGPMTYP RAPVPGTVVP GVPMNMGPMT YPRVPVPGTV 300 VPGVPMNMGP MTYSTPHTAH ESFMQYN* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 2cjj_A | 9e-18 | 7 | 80 | 6 | 79 | RADIALIS |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription activator that coordinates abscisic acid (ABA) biosynthesis and signaling-related genes via binding to the specific promoter motif 5'-(A/T)AACCAT-3'. Represses ABA-mediated salt (e.g. NaCl and KCl) stress tolerance. Regulates leaf shape and promotes vegetative growth. {ECO:0000269|PubMed:26243618}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00500 | DAP | Transfer from AT5G08520 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_138.5 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Induced by salicylic acid (SA) and gibberellic acid (GA) (PubMed:16463103). Triggered by dehydration and salt stress (PubMed:26243618). {ECO:0000269|PubMed:16463103, ECO:0000269|PubMed:26243618}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021889847.1 | 0.0 | transcription factor SRM1-like | ||||
| Swissprot | Q9FNN6 | 1e-121 | SRM1_ARATH; Transcription factor SRM1 | ||||
| TrEMBL | A0A0B0PER0 | 1e-154 | A0A0B0PER0_GOSAR; Transcription factor MYB1R1 | ||||
| STRING | evm.model.supercontig_138.5 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM3556 | 28 | 61 | Representative plant | OGRP275 | 17 | 122 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G08520.1 | 1e-109 | MYB family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_138.5 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




