![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_139.43 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | AP2 | ||||||||
| Protein Properties | Length: 464aa MW: 50809.8 Da PI: 7.635 | ||||||||
| Description | AP2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 53.6 | 5.7e-17 | 158 | 207 | 1 | 55 |
AP2 1 sgykGVrwdkkrgrWvAeIrdpsengkr.krfslgkfgtaeeAakaaiaarkkleg 55
s+y+GV++++++grW+++I+d + k+++lg f+ta Aa+a+++a+ k++g
evm.model.supercontig_139.43 158 SQYRGVTFYRRTGRWESHIWD------CgKQVYLGGFDTAHAAARAYDRAAIKFRG 207
78*******************......55************************997 PP
| |||||||
| 2 | AP2 | 27 | 1.2e-08 | 250 | 289 | 1 | 44 |
AP2 1 sgykGVrwdkkrgrWvAeIrdpsengkrkrfslgkfgtaeeAak 44
s+y+GV+ +k grW+A+ + +k+++lg f+++ eAa
evm.model.supercontig_139.43 250 SKYRGVTLHK-CGRWEARMGQF--L-GKKYIYLGLFDSEVEAAS 289
89********.7******5553..2.26**********889996 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF54171 | 1.57E-15 | 158 | 215 | IPR016177 | DNA-binding domain |
| Pfam | PF00847 | 5.2E-9 | 158 | 207 | IPR001471 | AP2/ERF domain |
| SMART | SM00380 | 1.1E-31 | 159 | 221 | IPR001471 | AP2/ERF domain |
| CDD | cd00018 | 2.02E-11 | 159 | 214 | No hit | No description |
| Gene3D | G3DSA:3.30.730.10 | 6.3E-17 | 159 | 215 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 17.609 | 159 | 215 | IPR001471 | AP2/ERF domain |
| CDD | cd00018 | 1.17E-12 | 250 | 288 | No hit | No description |
| SuperFamily | SSF54171 | 2.55E-8 | 250 | 289 | IPR016177 | DNA-binding domain |
| SMART | SM00380 | 3.5E-5 | 251 | 299 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 8.557 | 251 | 288 | IPR001471 | AP2/ERF domain |
| Gene3D | G3DSA:3.30.730.10 | 6.0E-5 | 251 | 289 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0010228 | Biological Process | vegetative to reproductive phase transition of meristem | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 464 aa Download sequence Send to blast |
MLDLDLNVDS AESNQNGDSF SEKLPQGSGN QMDESGTSNS SIVNADASSN GGGEEDSCST 60 RAFMLNFDIL KVGGGGRGSE NDAVVTKEFF PVSGSSEGHG KDFGNSEGQS SKSWIDLSFE 120 RGKQEGGTVG GGGDELRVVQ QASQPAKKSR RGPRSRSSQY RGVTFYRRTG RWESHIWDCG 180 KQVYLGGFDT AHAAARAYDR AAIKFRGVDA DINFILSDYE DDLKQMKNLT KEEFVHILRR 240 QSTGFSRGSS KYRGVTLHKC GRWEARMGQF LGKKYIYLGL FDSEVEAASM VKEIHNVKSF 300 QFVCRMMKYV IVMSISMPSS VYVLYDLHAQ MENSMPAALV DPPFKGLART SDPPFFWNGL 360 YPGLFPSEER AMEKRIELGS PQGLPNWAWQ MHSQVSAATP VPLFSTAASS GFSYSATPPS 420 AAIFPSKSLN HLTVHNLCFT PPSSAAANTS QFQYQMKPPH APT* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probably acts as a transcriptional activator. Binds to the GCC-box pathogenesis-related promoter element. May be involved in the regulation of gene expression by stress factors and by components of stress signal transduction pathways (By similarity). Regulates negatively the transition to flowering time and confers flowering time delay. {ECO:0000250, ECO:0000269|PubMed:14555699}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00615 | PBM | Transfer from AT2G28550 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_139.43 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Repressed by miR172a-2/EAT. {ECO:0000269|PubMed:14555699}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021889761.1 | 0.0 | ethylene-responsive transcription factor RAP2-7 | ||||
| Swissprot | Q9LVG2 | 1e-113 | TOE2_ARATH; AP2-like ethylene-responsive transcription factor TOE2 | ||||
| TrEMBL | A0A067L6P3 | 1e-173 | A0A067L6P3_JATCU; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_139.43 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5861 | 27 | 47 | Representative plant | OGRP497 | 17 | 84 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G28550.3 | 1e-117 | related to AP2.7 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_139.43 |




