![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_140.56 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ZF-HD | ||||||||
| Protein Properties | Length: 92aa MW: 9945.14 Da PI: 8.0522 | ||||||||
| Description | ZF-HD family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | ZF-HD_dimer | 105.6 | 3e-33 | 22 | 78 | 3 | 60 |
ZF-HD_dimer 3 kvrYkeClkNhAaslGghavDGCgEfmpsegeegtaaalkCaACgCHRnFHRreveee 60
+vrY eC+kNhAa +Gg+avDGC+Efm+s geegt+aal+CaACgCHRnFHRreve+e
evm.model.supercontig_140.56 22 SVRYAECQKNHAAGVGGYAVDGCREFMAS-GEEGTSAALTCAACGCHRNFHRREVETE 78
79**************************9.999*********************9986 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| ProDom | PD125774 | 9.0E-27 | 1 | 88 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| Pfam | PF04770 | 6.6E-31 | 23 | 75 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| TIGRFAMs | TIGR01566 | 9.4E-28 | 24 | 75 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| PROSITE profile | PS51523 | 26.258 | 25 | 74 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 92 aa Download sequence Send to blast |
MRKRQVVVRR EEPSRTPLTV RSVRYAECQK NHAAGVGGYA VDGCREFMAS GEEGTSAALT 60 CAACGCHRNF HRREVETEVV CECSSPPSNG N* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Inhibits zinc finger homeodomain (ZHD) transcription factors by interacting with them to prevent both their nuclear localization and their DNA-binding properties. Involved in integrating signals from multiple hormones by regulating the expression of specific genes. {ECO:0000269|PubMed:21455630}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_140.56 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021889716.1 | 8e-61 | mini zinc finger protein 2 | ||||
| Swissprot | Q9LJW5 | 5e-45 | MIF2_ARATH; Mini zinc finger protein 2 | ||||
| TrEMBL | A0A061EGD2 | 6e-54 | A0A061EGD2_THECC; Mini zinc finger 2 isoform 2 (Fragment) | ||||
| TrEMBL | A0A1R3GV65 | 6e-54 | A0A1R3GV65_9ROSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_140.56 | 3e-60 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM944 | 28 | 114 | Representative plant | OGRP91 | 16 | 237 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G28917.1 | 7e-39 | mini zinc finger 2 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_140.56 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




