![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_1427.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C3H | ||||||||
| Protein Properties | Length: 270aa MW: 29624.8 Da PI: 8.6068 | ||||||||
| Description | C3H family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-CCCH | 25.4 | 2.5e-08 | 26 | 46 | 5 | 26 |
--SGGGGTS--TTTTT-SS-SS CS
zf-CCCH 5 lCrffartGtCkyGdrCkFaHg 26
C++f++ G Ck Gd C FaHg
evm.model.supercontig_1427.1 26 ACPDFRK-GNCKKGDACEFAHG 46
7******.*************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50103 | 6.456 | 1 | 10 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 5.4E-6 | 21 | 47 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 13.751 | 22 | 48 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 6.1E-6 | 25 | 48 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 2.2E-6 | 26 | 46 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 6 | 56 | 79 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 6.963 | 56 | 80 | IPR000571 | Zinc finger, CCCH-type |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0009867 | Biological Process | jasmonic acid mediated signaling pathway | ||||
| GO:0010150 | Biological Process | leaf senescence | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0005886 | Cellular Component | plasma membrane | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 270 aa Download sequence Send to blast |
TECPYAHPGE KARRRDPRKY HYSGTACPDF RKGNCKKGDA CEFAHGVFEC WLHPGRYRTQ 60 PCKDGPNCRR RVCFFAHSPE QLRVLPQQSP RSINSADSFD ASPLRQAIEA SCAMKLPFMS 120 SPGSVSPPTS PRGESPPMSP MPVSLSRSAG SCSIHEMVAS LRNLQLGKMK SLPSSWNVQV 180 GSPSGFGSPR GSLLRPGFCS LPATPTRAPA CPGIGYLDAW DKVCEEEPVM ERVESGRDLR 240 AKMFEKLSKE NLLDREEAPD VGWVSELIK* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_1427.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021892808.1 | 0.0 | zinc finger CCCH domain-containing protein 20-like | ||||
| Swissprot | Q9M0G2 | 1e-105 | C3H49_ARATH; Zinc finger CCCH domain-containing protein 49 | ||||
| TrEMBL | A0A2C9W5H3 | 1e-156 | A0A2C9W5H3_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_1427.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1249 | 27 | 88 | Representative plant | OGRP1170 | 16 | 44 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G19810.1 | 3e-90 | C3H family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_1427.1 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




