![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_144.7 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 220aa MW: 25530.4 Da PI: 4.7142 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 59.2 | 6.6e-19 | 29 | 83 | 2 | 56 |
T--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHH CS
Homeobox 2 rkRttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakek 56
+++++f+++q++ Le++Fe+++ + +++ e A++lgL+ rqV +WFqN+Ra++k
evm.model.supercontig_144.7 29 KNKRRFSDDQIKSLETMFESESRLEPRKKVEVARELGLQPRQVAIWFQNKRARWK 83
67889*************************************************9 PP
| |||||||
| 2 | HD-ZIP_I/II | 121.6 | 3.8e-39 | 30 | 120 | 2 | 92 |
HD-ZIP_I/II 2 kkrrlskeqvklLEesFeeeekLeperKvelareLglqprqvavWFqnrRARtktkqlEkdyeaLkraydalkeenerLeke 83
+krr+s++q+k+LE++Fe+e++Lep++Kve+areLglqprqva+WFqn+RAR+k+kqlEkdy+ L+++y++l+++ e+L+ke
evm.model.supercontig_144.7 30 NKRRFSDDQIKSLETMFESESRLEPRKKVEVARELGLQPRQVAIWFQNKRARWKSKQLEKDYNILRTTYNNLASQFENLKKE 111
79******************************************************************************** PP
HD-ZIP_I/II 84 veeLreelk 92
+++L +l+
evm.model.supercontig_144.7 112 KQALIIQLE 120
****98886 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.10.10.60 | 1.8E-19 | 7 | 86 | IPR009057 | Homeodomain-like |
| SuperFamily | SSF46689 | 3.8E-18 | 17 | 87 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 17.945 | 25 | 85 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 1.6E-16 | 27 | 89 | IPR001356 | Homeobox domain |
| Pfam | PF00046 | 3.2E-16 | 29 | 83 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 1.34E-13 | 34 | 86 | No hit | No description |
| PRINTS | PR00031 | 8.5E-6 | 56 | 65 | IPR000047 | Helix-turn-helix motif |
| PROSITE pattern | PS00027 | 0 | 60 | 83 | IPR017970 | Homeobox, conserved site |
| PRINTS | PR00031 | 8.5E-6 | 65 | 81 | IPR000047 | Helix-turn-helix motif |
| Pfam | PF02183 | 9.6E-14 | 85 | 122 | IPR003106 | Leucine zipper, homeobox-associated |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009414 | Biological Process | response to water deprivation | ||||
| GO:0009738 | Biological Process | abscisic acid-activated signaling pathway | ||||
| GO:0045893 | Biological Process | positive regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 220 aa Download sequence Send to blast |
MLDGEETEGF GCNMDGVGII RKIKKNKNKN KRRFSDDQIK SLETMFESES RLEPRKKVEV 60 ARELGLQPRQ VAIWFQNKRA RWKSKQLEKD YNILRTTYNN LASQFENLKK EKQALIIQLE 120 RQNELMMQKA GEESKCCSQT ESDNNNPCES EVKTRSEVGL GLVSEDDSGA INTDYFGLEQ 180 EEPIRLMSSQ EDDWGNFESD NLFDHSTNCS SCQWWDFWS* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription activator that may act as growth regulators in response to water deficit. {ECO:0000269|PubMed:15604708, ECO:0000269|PubMed:8771791}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00320 | DAP | Transfer from AT2G46680 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_144.7 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: By water deficit, by abscisic acid (ABA) and by salt stress. {ECO:0000269|PubMed:16055682, ECO:0000269|PubMed:8771791}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021889570.1 | 1e-161 | homeobox-leucine zipper protein ATHB-12 | ||||
| Swissprot | P46897 | 2e-60 | ATHB7_ARATH; Homeobox-leucine zipper protein ATHB-7 | ||||
| TrEMBL | A0A1R3KNH4 | 5e-74 | A0A1R3KNH4_9ROSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_144.7 | 1e-160 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM2498 | 28 | 74 | Representative plant | OGRP129 | 16 | 189 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G46680.1 | 3e-58 | homeobox 7 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_144.7 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




