![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_150.42 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | DBB | ||||||||
| Protein Properties | Length: 318aa MW: 35637 Da PI: 6.1767 | ||||||||
| Description | DBB family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-B_box | 22.9 | 1.8e-07 | 5 | 34 | 6 | 35 |
zf-B_box 6 CpeHeekelqlfCedCqqllCedClleeHk 35
C+ ++++e+++fC ++ lC+ C H+
evm.model.supercontig_150.42 5 CDMCDKEEASIFCSADEAALCDACDRRVHH 34
*************************99974 PP
| |||||||
| 2 | zf-B_box | 27.4 | 6.8e-09 | 54 | 92 | 2 | 38 |
zf-B_box 2 eerkCpeHeekelqlfCedCqqllCedClleeHkg..Ht 38
e + C+ ++e ++ lfC++++ lC++C l +H+ Ht
evm.model.supercontig_150.42 54 ESPLCDICQERRALLFCKEDRAILCRECDLPIHQAneHT 92
5789*****************************767765 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50119 | 10.993 | 1 | 47 | IPR000315 | B-box-type zinc finger |
| SMART | SM00336 | 7.5E-6 | 4 | 47 | IPR000315 | B-box-type zinc finger |
| CDD | cd00021 | 1.07E-4 | 5 | 33 | No hit | No description |
| Pfam | PF00643 | 1.5E-5 | 5 | 34 | IPR000315 | B-box-type zinc finger |
| PROSITE profile | PS50119 | 10.48 | 53 | 100 | IPR000315 | B-box-type zinc finger |
| SMART | SM00336 | 4.9E-16 | 53 | 100 | IPR000315 | B-box-type zinc finger |
| Pfam | PF00643 | 1.5E-7 | 54 | 92 | IPR000315 | B-box-type zinc finger |
| CDD | cd00021 | 4.19E-10 | 56 | 100 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0010200 | Biological Process | response to chitin | ||||
| GO:0080167 | Biological Process | response to karrikin | ||||
| GO:1900458 | Biological Process | negative regulation of brassinosteroid mediated signaling pathway | ||||
| GO:2000306 | Biological Process | positive regulation of photomorphogenesis | ||||
| GO:0005622 | Cellular Component | intracellular | ||||
| GO:0008270 | Molecular Function | zinc ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 318 aa Download sequence Send to blast |
MKIWCDMCDK EEASIFCSAD EAALCDACDR RVHHANELAR QHLRFSLVIP NLRESPLCDI 60 CQERRALLFC KEDRAILCRE CDLPIHQANE HTQKHNRFLL TGVKLSASSS SSSSSLNPSS 120 SCSNRSAATM GAEFNNFQSP MKRAQSTSSP CELFSSPSMA VAATNYTVHD YNKVMSDGGS 180 IPTSSISEYL METLPGWRVE DLLDPSAAFN CFSKTHDGDD TSTHRGEDFE SNTMSYYFSS 240 PEYLAVRVPQ VKSNLHPIPQ TKQELENYRR TLTLSPEERS SGVVATSQCI LGRFYREKVL 300 FCSDSEKDFQ RKEMKIA* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Acts as positive regulator of seedling photomorphogenesis. Plays a negative role in brassinosteroid responses. {ECO:0000269|PubMed:22535582}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_150.42 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021889250.1 | 0.0 | B-box zinc finger protein 20-like isoform X1 | ||||
| Swissprot | Q0IGM7 | 5e-69 | BBX20_ARATH; B-box zinc finger protein 20 | ||||
| TrEMBL | A0A2N9GXM4 | 2e-81 | A0A2N9GXM4_FAGSY; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_150.42 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM6597 | 27 | 43 | Representative plant | OGRP2984 | 11 | 30 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G39070.1 | 4e-66 | DBB family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_150.42 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




