![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_150.6 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C3H | ||||||||
| Protein Properties | Length: 452aa MW: 49494.5 Da PI: 7.4485 | ||||||||
| Description | C3H family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-CCCH | 18.2 | 4.6e-06 | 103 | 128 | 4 | 26 |
---SGGGGTS...--TTTTT-SS-SS CS
zf-CCCH 4 elCrffartG...tCkyGdrCkFaHg 26
lC+ a+tG C+y d+C+F+H+
evm.model.supercontig_150.6 103 NLCPEVAKTGdtsACPYKDKCRFSHD 128
59***********************7 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00356 | 0.072 | 99 | 129 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 11.422 | 99 | 130 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 3.5E-4 | 103 | 130 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 35 | 140 | 165 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 7.291 | 143 | 168 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:3.20.20.70 | 2.7E-9 | 325 | 367 | IPR013785 | Aldolase-type TIM barrel |
| SuperFamily | SSF51395 | 8.97E-6 | 329 | 367 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003824 | Molecular Function | catalytic activity | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 452 aa Download sequence Send to blast |
MEDSAAEVAD LPLVEGDNPP SALTMEKDSN GFGQATPEEL VSRAIAPVKR EFLRPPPSRT 60 TEQQNDAIQE AQAKPSQPGL LKEKKSKRQL KRERREEKKS AMNLCPEVAK TGDTSACPYK 120 DKCRFSHDLE AFNAQKPVDL EGECPFMSPG ASCPYGVTCR FAGTHKDGGQ VGFSTLGKRS 180 SEINILNKDF QKLLWKNKVR FPKADAKLKS FGLQGKAYSK KMLEDKKEAN QIMSNGSLGD 240 DENDCTRVSN STAETRSALE APSGVNPNET CATDEPPLKK AKSNDDVDVL KKDNARAEQE 300 GVEDIIVTDS DESLKLHPRE KKLIDFREKL YLAPLTTVGN LPFRRLCKAL GADITCGEMA 360 MCSNLLQVCL CPLLCLPLVI DDGTANKVVL IQNTASTMQG FSLEYPLSKK LFLIYPSVSF 420 SLNNSLLRRV TVLGSCLAVG DKYLGDKYLG T* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Catalyzes the synthesis of dihydrouridine, a modified base found in the D-loop of most tRNAs. {ECO:0000250}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_150.6 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021889313.1 | 0.0 | LOW QUALITY PROTEIN: tRNA-dihydrouridine(47) synthase [NAD(P)(+)]-like | ||||
| Swissprot | Q9T0J6 | 1e-104 | DUS3L_ARATH; tRNA-dihydrouridine(47) synthase [NAD(P)(+)]-like | ||||
| TrEMBL | A0A061DYQ2 | 1e-134 | A0A061DYQ2_THECC; tRNA-dihydrouridine(47) synthase [NAD(P)(+)] | ||||
| STRING | evm.model.supercontig_150.6 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Representative plant | OGRP5751 | 12 | 13 |
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_150.6 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




