![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_157.5 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 564aa MW: 60656.6 Da PI: 7.1372 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 26.8 | 9.5e-09 | 378 | 425 | 4 | 55 |
HHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 4 ahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
+h+ +Er RR++i +++ L++l+P + +k Ka +L + ++Y++sLq
evm.model.supercontig_157.5 378 SHSLAERVRREKISERMKFLQDLVPGC----NKVTGKAVMLDEIINYVQSLQ 425
8*************************9....677*****************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF47459 | 3.53E-17 | 372 | 444 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 4.41E-11 | 372 | 429 | No hit | No description |
| Gene3D | G3DSA:4.10.280.10 | 5.0E-17 | 374 | 442 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| PROSITE profile | PS50888 | 15.663 | 374 | 424 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 8.7E-6 | 378 | 425 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 5.5E-10 | 380 | 430 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 564 aa Download sequence Send to blast |
MEKEKVVVSE GVNQTAQPIW SSSSFGMEIQ NCGMEQLPNC FFNPNWENSV DQSDPFESAL 60 SSLVSSPVTS NAAGDILPPV GGVGGGLMIN ELIGRIGNIA GSGEKSHQSY IINSNSHGGT 120 NNSCYNNPLN SPPKRNSPMM VSQIRGNLPI PGNLFPDHPN LTQFTADPGF AERAARLSCF 180 RSGMNGGTGL NGDSVGLSHG SVHRTESSKL SKVSSNQSIK LAGSLLNGQE SNKSSTQDPN 240 SDEKFSKVSR SLVPINGEFV DSRENSSVSE QIPVVESSFK GPNEGSSRKR KSISRGKAVE 300 TPSVSPSAND AKVTAENDES RAKRSKEDHS TICENEKVKP ESNGNDGNSK QGKDNSKPPE 360 PPKDYIHVRA RRGQATDSHS LAERVRREKI SERMKFLQDL VPGCNKVTGK AVMLDEIINY 420 VQSLQRQVEF LSMKLATVNP RMDFSVDTLL SKGVLQPRGS LSQSIFPVES SSTPGFPFGY 480 QPRQGMPLSN RAETQLPINS LSALLRGNPS MHLPSIDGNG EVAPQASMPW EDDLQSLVQM 540 GFGQNHAQIV HGSMAAGHMK VEL* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 286 | 291 | SRKRKS |
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00660 | PBM | Transfer from Pp3c6_9520 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_157.5 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021888949.1 | 0.0 | transcription factor bHLH78-like | ||||
| TrEMBL | A0A2K2BND6 | 0.0 | A0A2K2BND6_POPTR; BHLH family protein | ||||
| STRING | evm.model.supercontig_157.5 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM2332 | 27 | 75 | Representative plant | OGRP58 | 16 | 313 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G23690.1 | 7e-69 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_157.5 |




