![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_158.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 542aa MW: 56416.1 Da PI: 8.6501 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 17.1 | 1.6e-05 | 61 | 83 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
++C++C+k F r nL+ H r H
evm.model.supercontig_158.1 61 FVCEICNKGFQRDQNLQLHRRGH 83
89*******************88 PP
| |||||||
| 2 | zf-C2H2 | 11.1 | 0.0013 | 137 | 159 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
+kC +C+k + +s+ k H + +
evm.model.supercontig_158.1 137 WKCDKCSKKYAVQSDWKAHSKIC 159
58*****************9876 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:3.30.160.60 | 1.8E-5 | 60 | 83 | IPR013087 | Zinc finger C2H2-type/integrase DNA-binding domain |
| SuperFamily | SSF57667 | 9.61E-7 | 60 | 83 | No hit | No description |
| PROSITE profile | PS50157 | 10.949 | 61 | 83 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 0.017 | 61 | 83 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE pattern | PS00028 | 0 | 63 | 83 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 220 | 102 | 132 | IPR015880 | Zinc finger, C2H2-like |
| Gene3D | G3DSA:3.30.160.60 | 7.0E-4 | 125 | 158 | IPR013087 | Zinc finger C2H2-type/integrase DNA-binding domain |
| SuperFamily | SSF57667 | 9.61E-7 | 132 | 157 | No hit | No description |
| SMART | SM00355 | 150 | 137 | 157 | IPR015880 | Zinc finger, C2H2-like |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009937 | Biological Process | regulation of gibberellic acid mediated signaling pathway | ||||
| GO:0010029 | Biological Process | regulation of seed germination | ||||
| GO:0010431 | Biological Process | seed maturation | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0044212 | Molecular Function | transcription regulatory region DNA binding | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 542 aa Download sequence Send to blast |
MPVDLDNSST ASGEASVSSS GNQNPPPKSA AKKKRNLPGM PDPDAEVIAL SPKTLLATNR 60 FVCEICNKGF QRDQNLQLHR RGHNLPWKLR QRSSKEVKKR VYVCPESTCV HHDPSRALGD 120 LTGIKKHFCR KHGEKKWKCD KCSKKYAVQS DWKAHSKICG TREYKCDCGT LFSRRDSFIT 180 HRAFCDALAE ESARAKTQTP SQNQKQAQTQ NQVVVNSNPE SDSNVQAMDS SPPATPAPVP 240 AKAQAQITTP SPAPAPAPAQ SQTQVPTQST GMVFSSVLPV QNSEMPESST QVMEEAPMTA 300 GLNGSSSSSN SASSSSSASS SVFASLFASS AASGRLQTSQ PPAFTDLIRA VSRPDCPAEL 360 APSSSTEPIS LCLSTSHGSS IFGTAGQERR QYAPPPQPAM SATALLQKAA QMGAAATNAS 420 LLRGFGIVSS SSTSSQQENL QWGSGQVEPD NASVHAGLGL GLPCDGGSGL KELMMATPSV 480 FGPKQTTLDF LGLGMAAGGS PTSSLSALIT SIGGGIDVAA AAAAASFGGG EFSGKDIGRT 540 S* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5b3h_C | 1e-33 | 133 | 197 | 3 | 67 | Zinc finger protein JACKDAW |
| 5b3h_F | 1e-33 | 133 | 197 | 3 | 67 | Zinc finger protein JACKDAW |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor promoting the transition to germination by regulating light and hormonal signaling during seed maturation (PubMed:21571950). Acts as a positive regulator of phytochrome and/or gibberellin action (PubMed:21571950, PubMed:25035403). {ECO:0000269|PubMed:21571950, ECO:0000269|PubMed:25035403}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00592 | DAP | Transfer from AT5G66730 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_158.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021888880.1 | 0.0 | protein indeterminate-domain 2-like | ||||
| Swissprot | Q9LVQ7 | 0.0 | IDD1_ARATH; Zinc finger protein ENHYDROUS | ||||
| TrEMBL | A0A067K9Z7 | 0.0 | A0A067K9Z7_JATCU; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_158.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM155 | 28 | 306 | Representative plant | OGRP95 | 16 | 242 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G66730.1 | 1e-114 | C2H2-like zinc finger protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_158.1 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




