![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_16.148 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 382aa MW: 42000.1 Da PI: 5.9079 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 55.3 | 1.7e-17 | 57 | 105 | 3 | 55 |
AP2 3 ykGVrwdkkrgrWvAeIrdpsengkrkrfslgkfgtaeeAakaaiaarkkleg 55
+ GVr+++ +gr++AeIrdp++ + r++lg+f+ta+eAa a+++a+++++g
evm.model.supercontig_16.148 57 FLGVRRRP-WGRYAAEIRDPTT---KERHWLGTFDTAQEAALAYDRAALSMKG 105
56******.**********965...5***********************9986 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00380 | 1.2E-31 | 56 | 119 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 20.534 | 56 | 113 | IPR001471 | AP2/ERF domain |
| CDD | cd00018 | 8.05E-28 | 56 | 112 | No hit | No description |
| SuperFamily | SSF54171 | 9.15E-20 | 57 | 114 | IPR016177 | DNA-binding domain |
| Gene3D | G3DSA:3.30.730.10 | 2.2E-27 | 57 | 112 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 1.5E-7 | 57 | 68 | IPR001471 | AP2/ERF domain |
| Pfam | PF00847 | 6.0E-11 | 59 | 105 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 1.5E-7 | 79 | 95 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0010102 | Biological Process | lateral root morphogenesis | ||||
| GO:0010432 | Biological Process | bract development | ||||
| GO:0010451 | Biological Process | floral meristem growth | ||||
| GO:0010582 | Biological Process | floral meristem determinacy | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0044212 | Molecular Function | transcription regulatory region DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 382 aa Download sequence Send to blast |
MAASKPSDKP FKPFELPSPQ MGSFALIQRT TATTTSTTTS PSQERRGRRK QGEPGRFLGV 60 RRRPWGRYAA EIRDPTTKER HWLGTFDTAQ EAALAYDRAA LSMKGVQART NFVYTHNTGF 120 HSLLSPNLVD HHQTLIFPPP ANSNFLTNPP AKKPVINQNS TSPDQLNKGT ILHGDDRDRD 180 RDHDHNSNIL SSSVDDCSSN FFFSPDDSNS GYLDCVVPGN CLKPPSSSQN HKSSTDIHIN 240 QYSHCDDRSY SSVFDPVDVT SMSTMGISNN NDDFSAWFGE EVVNMQGGFW RDDDHQQQQQ 300 PWELSYYSGT QVSTTIVNDV ALDGCIGNNF YPAAMDNFGN GVMLPQVQAA SSSSCSSKSC 360 SSPSLPVGPF GEVMESGYPL F* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5wx9_A | 4e-20 | 47 | 119 | 5 | 78 | Ethylene-responsive transcription factor ERF096 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probably acts as a transcriptional activator. May be involved in the regulation of gene expression by stress factors and by components of stress signal transduction pathways (By similarity). Involved in the control of cell division patterns during the early lateral root primordium development. Acts downstream of auxin signaling (PubMed:17630277). Regulated by ARF7 and ARF19 in response to auxin. Co-acts with LBD16 and LBD18 to control lateral root development (PubMed:23749813). Involved in the determination of floral meristem identity and suppression of bract growth. Required for proper conversion of secondary inflorescences to flowers. Acts together with NPR5/BOP2 and NPR6/BOP1 to promote expression of LFY and AP1, two central regulators of floral meristem identity (PubMed:19482972). {ECO:0000250|UniProtKB:Q9LND1, ECO:0000269|PubMed:17630277, ECO:0000269|PubMed:19482972, ECO:0000269|PubMed:23749813}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00520 | DAP | Transfer from AT5G18560 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_16.148 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: By auxin. {ECO:0000269|PubMed:17630277, ECO:0000269|PubMed:23749813}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021904878.1 | 0.0 | ethylene-responsive transcription factor ERF086 | ||||
| Swissprot | Q6J9Q2 | 9e-56 | ERF86_ARATH; Ethylene-responsive transcription factor ERF086 | ||||
| STRING | evm.model.supercontig_16.148 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5487 | 26 | 50 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G18560.1 | 7e-49 | ERF family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_16.148 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




