![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_171.9 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 131aa MW: 14768.7 Da PI: 5.5999 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 14.4 | 0.00011 | 95 | 117 | 2 | 23 |
EETTTTEEESSHHHHHHHHHH.T CS
zf-C2H2 2 kCpdCgksFsrksnLkrHirt.H 23
+C+ C+++++++ +L H + H
evm.model.supercontig_171.9 95 SCSVCSRVYPTSRLLSMHVSEaH 117
6*****************99877 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00355 | 0.54 | 67 | 92 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE pattern | PS00028 | 0 | 69 | 92 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 4.8 | 94 | 117 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE pattern | PS00028 | 0 | 96 | 117 | IPR007087 | Zinc finger, C2H2 |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 131 aa Download sequence Send to blast |
MAMVVDTKTE FGFPYWTSVL RRFGPDSSFF ASGNIERELL AKQVALDISE DEKNQLQNMI 60 VEESREVFCP IVGCGARLSS LDNFEDHYNA RHSASCSVCS RVYPTSRLLS MHVSEAHDSF 120 FQAKVARGYA M |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_171.9 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021888266.1 | 3e-95 | zinc finger protein 511 | ||||
| TrEMBL | A0A2C9UHJ0 | 1e-74 | A0A2C9UHJ0_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_171.9 | 1e-94 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM9971 | 26 | 32 | Representative plant | OGRP7538 | 13 | 13 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G14140.1 | 3e-70 | zinc ion binding;nucleic acid binding;zinc ion binding | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_171.9 |




