![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_18.194 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 292aa MW: 32129.8 Da PI: 9.5109 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 63.7 | 3.8e-20 | 40 | 90 | 2 | 56 |
AP2 2 gykGVrwdkkrgrWvAeIrdpsengkrkrfslgkfgtaeeAakaaiaarkklege 56
++ GVr+++ +grWvAeI+d + +r r +lg+++t+eeAa+a+++a+++l+ge
evm.model.supercontig_18.194 40 RFVGVRQRP-SGRWVAEIKDST---QRVRLWLGTYDTPEEAARAYDEAARALRGE 90
589******.7*********43...36**************************97 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00380 | 1.2E-35 | 40 | 103 | IPR001471 | AP2/ERF domain |
| CDD | cd00018 | 9.21E-31 | 40 | 99 | No hit | No description |
| Gene3D | G3DSA:3.30.730.10 | 2.5E-28 | 40 | 97 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 20.56 | 40 | 97 | IPR001471 | AP2/ERF domain |
| Pfam | PF00847 | 4.3E-15 | 40 | 90 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 2.8E-7 | 41 | 52 | IPR001471 | AP2/ERF domain |
| SuperFamily | SSF54171 | 4.84E-20 | 41 | 97 | IPR016177 | DNA-binding domain |
| PRINTS | PR00367 | 2.8E-7 | 63 | 79 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 292 aa Download sequence Send to blast |
MARLDQTKEA TAANTTTTTT TTSSDKRAKK PIMTGAAARR FVGVRQRPSG RWVAEIKDST 60 QRVRLWLGTY DTPEEAARAY DEAARALRGE NARTNFAPVN QSTSSTSNGS LVMSSGSDCR 120 HGLSFSSLRA RLSKNLQNIM ARSTESKTTK SRVSDHFTFA SIFHFRGYQN QSPRPVDVKG 180 MEKVVQPSII VPHAGGEPQE LCSWDSSDSS NECIGLRQHG FDSEGSDIGE LNTLVGDHHH 240 HHNHFHHHEC MMGWMVGAEI MSEKYVEGSR SKRFKVSSSV VVPPTFSASP F* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5wx9_A | 3e-14 | 34 | 96 | 8 | 71 | Ethylene-responsive transcription factor ERF096 |
| Search in ModeBase | ||||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_18.194 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021904501.1 | 0.0 | dehydration-responsive element-binding protein 2C-like | ||||
| TrEMBL | A0A061DTN1 | 1e-107 | A0A061DTN1_THECC; AP2/ERF domain-containing transcription factor | ||||
| TrEMBL | A5BB59 | 1e-107 | A5BB59_VITVI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_18.194 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM18292 | 8 | 9 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G19790.1 | 6e-17 | related to AP2 11 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_18.194 |




