![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_19.156 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 248aa MW: 27194.9 Da PI: 9.1374 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 39.3 | 1.1e-12 | 69 | 115 | 3 | 54 |
HHHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHH CS
HLH 3 rahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksL 54
++h+++E+rRRdriN +++Lr+l+Pk+ K++Ka+ L ++e +k+L
evm.model.supercontig_19.156 69 KSHSQAEKRRRDRINAQLATLRKLIPKS-----DKMDKAALLGSVIEQVKDL 115
68*************************8.....7*************99988 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 14.583 | 66 | 115 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 9.16E-13 | 67 | 123 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 2.3E-10 | 69 | 115 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 3.5E-14 | 69 | 118 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 8.25E-10 | 69 | 118 | No hit | No description |
| SMART | SM00353 | 1.3E-10 | 72 | 121 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:3.30.70.260 | 4.9E-6 | 153 | 215 | No hit | No description |
| SuperFamily | SSF55021 | 4.73E-6 | 153 | 218 | No hit | No description |
| CDD | cd04873 | 5.63E-6 | 156 | 191 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 248 aa Download sequence Send to blast |
MENSYFYHSA WPELTNFSDS NDGESRCLFP WSVPPCVSAS PDSVQLHGCP SWSIPVEGVA 60 EDKAASVSKS HSQAEKRRRD RINAQLATLR KLIPKSDKMD KAALLGSVIE QVKDLKRKAT 120 EASKALSVPT EVDEVTVDDC AADSKGSSES AFFRATLCCD DRPEVFSELI RVLKGLKMSI 180 VRADISSVGG RMRSNLVMST KGSVSMSTLR QSLNVFLSRI ASSSVTSNCR IRSKRQRLFL 240 PSNFSHQ* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_19.156 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Repressed by salicylic acid (SA) treatment. {ECO:0000269|PubMed:12679534}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021904097.1 | 0.0 | transcription factor bHLH51-like | ||||
| Swissprot | Q9XEF0 | 9e-57 | BH051_ARATH; Transcription factor bHLH51 | ||||
| TrEMBL | A0A061FT34 | 1e-103 | A0A061FT34_THECC; Basic helix-loop-helix DNA-binding superfamily protein, putative | ||||
| STRING | evm.model.supercontig_19.156 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM6806 | 25 | 42 | Representative plant | OGRP377 | 15 | 106 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G40200.1 | 1e-52 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_19.156 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




