PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_19.98 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 163aa MW: 17640.1 Da PI: 5.6552 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 11.2 | 0.00068 | 8 | 43 | 13 | 54 |
HHHHHHHHHHHHCTSCC.C...TTS-STCHHHHHHHHHHHHHH CS
HLH 13 RdriNsafeeLrellPk.askapskKlsKaeiLekAveYIksL 54
R+ +N+++++Lr++ + a ++K +i A +YIk+L
evm.model.supercontig_19.98 8 RAVLNEKLQTLRSITNShA-------VNKTSIIVDASKYIKEL 43
56799********998855.......9**************99 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF47459 | 3.27E-6 | 7 | 59 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 1.8E-7 | 8 | 56 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd04873 | 3.75E-4 | 83 | 152 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 163 aa Download sequence Send to blast |
MVSREHKRAV LNEKLQTLRS ITNSHAVNKT SIIVDASKYI KELKQKVERL NQDIAATCTQ 60 TSTDQNPLPG IHVTVETLEK GFLINVCCGR SCPGLLVSIL EAFEDLGLNV LEARVSCTES 120 FRLQAVGGED GEDEASESID AQVVKQVVLQ AIKNWGGPAH QG* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_19.98 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021904163.1 | 1e-116 | transcription factor SCREAM2 | ||||
| TrEMBL | A0A1R3HFM6 | 2e-83 | A0A1R3HFM6_9ROSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_19.98 | 1e-116 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1594 | 3 | 3 | Representative plant | OGRP1907 | 3 | 5 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G12860.1 | 2e-12 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_19.98 |