![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_190.30 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 170aa MW: 18299.2 Da PI: 10.4982 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 11.2 | 0.0012 | 30 | 52 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
++C+ C++ F++ L H +H
evm.model.supercontig_190.30 30 FTCKTCNREFPSFQALGGHRASH 52
89**********99999998887 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF57667 | 1.56E-8 | 28 | 95 | No hit | No description |
| Pfam | PF13912 | 2.2E-12 | 29 | 54 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 0.16 | 30 | 52 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE profile | PS50157 | 9.224 | 30 | 57 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 32 | 52 | IPR007087 | Zinc finger, C2H2 |
| Pfam | PF13912 | 7.5E-10 | 72 | 97 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 0.5 | 73 | 95 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE profile | PS50157 | 9.473 | 73 | 100 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 75 | 95 | IPR007087 | Zinc finger, C2H2 |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 170 aa Download sequence Send to blast |
MANCLMLLSK VGKNDGVFTL GKPTQNGRVF TCKTCNREFP SFQALGGHRA SHKKPQLDQT 60 TQLPVSPKKP KTHECSICGL EFAIGQALGG HMRRHRGGGH SGNSESSSSE TKRSAVVMGP 120 ATLTMKKTSK IKRVFGLDLN LTPLENDCLR LGLGKVATTS HHHVVDCFM* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 110 | 117 | TKRSAVVM |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_190.30 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021887642.1 | 1e-123 | zinc finger protein ZAT12-like | ||||
| TrEMBL | A0A438JY50 | 9e-52 | A0A438JY50_VITVI; Zinc finger protein ZAT12 | ||||
| TrEMBL | F6HN90 | 9e-52 | F6HN90_VITVI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_190.30 | 1e-122 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM531 | 28 | 150 | Representative plant | OGRP131 | 15 | 149 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G28710.1 | 1e-35 | C2H2 family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_190.30 |




