![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_194.18 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bZIP | ||||||||
| Protein Properties | Length: 354aa MW: 36904.7 Da PI: 6.749 | ||||||||
| Description | bZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | bZIP_1 | 25.3 | 3.3e-08 | 233 | 270 | 26 | 63 |
HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH CS
bZIP_1 26 aeieeLeekvkeLeaeNkaLkkeleelkkevaklksev 63
ae+eeL++kv+ L+aeN Lk+e+ +l+++++kl+ e+
evm.model.supercontig_194.18 233 AETEELARKVECLTAENVGLKSEIGQLTDKSDKLRREN 270
799*******************************9886 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF07777 | 6.6E-36 | 1 | 92 | IPR012900 | G-box binding protein, multifunctional mosaic region |
| Pfam | PF16596 | 6.8E-21 | 126 | 221 | No hit | No description |
| Gene3D | G3DSA:1.20.5.170 | 3.5E-5 | 233 | 268 | No hit | No description |
| Pfam | PF00170 | 5.4E-7 | 233 | 270 | IPR004827 | Basic-leucine zipper domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0009737 | Biological Process | response to abscisic acid | ||||
| GO:0005829 | Cellular Component | cytosol | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| GO:0044212 | Molecular Function | transcription regulatory region DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 354 aa Download sequence Send to blast |
MGNSEEGKSS KSDKSSSPAP ADQTNIHVYP DWAAMQAYYS PRVPIPPYYN SAMPSGHPPH 60 PYMWGPQPMM PPYGAPYAAI YSHGGVYAHP AVSLGSHSQG HGVPLSPATA TPLSIETPTK 120 SSGITDRSLM KKLKGFDGLA MSIGNGNTDS AEGAGEHGLS KSIDTEGSSD GSDGSTSGVD 180 QTKRKRRHEG TPTAGGKNQG QSGSVPAGDP AYNKVLGTAG GPANIIGNAS GTAETEELAR 240 KVECLTAENV GLKSEIGQLT DKSDKLRREN VALMEKLKNA QLVRTEEMGL NNVDDKRAAP 300 VNTENLLSRV NNSGSHDRST EQEGEVYEKK SNSGAKLHQL LGASPRADAV AAG* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Binds to the G-box motif (5'-CCACGTGG-3') of the rbcS-1A gene promoter. G-box and G-box-like motifs are cis-acting elements defined in promoters of certain plant genes which are regulated by such diverse stimuli as light-induction or hormone control. {ECO:0000269|PubMed:8672884}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00318 | DAP | Transfer from AT2G46270 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_194.18 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021887548.1 | 0.0 | G-box-binding factor 3-like | ||||
| Swissprot | P42776 | 1e-98 | GBF3_ARATH; G-box-binding factor 3 | ||||
| TrEMBL | B9RE16 | 1e-145 | B9RE16_RICCO; Common plant regulatory factor CPRF-1, putative | ||||
| STRING | evm.model.supercontig_194.18 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM3571 | 26 | 61 | Representative plant | OGRP4346 | 11 | 23 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G46270.2 | 3e-81 | G-box binding factor 3 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_194.18 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




