![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_20.67 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 200aa MW: 21684.3 Da PI: 4.8164 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 30.7 | 8e-10 | 54 | 89 | 26 | 55 |
AP2 26 g......krkrfslgkfgtaeeAakaaiaarkkleg 55
g + r++lg+f tae+Aa+a++ a+ +l+g
evm.model.supercontig_20.67 54 GirmrnsGNSRIWLGTFPTAEMAARAHDVAAIALRG 89
333322345*************************98 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS51032 | 15.83 | 31 | 97 | IPR001471 | AP2/ERF domain |
| SMART | SM00380 | 4.4E-19 | 51 | 103 | IPR001471 | AP2/ERF domain |
| SuperFamily | SSF54171 | 2.88E-13 | 51 | 99 | IPR016177 | DNA-binding domain |
| CDD | cd00018 | 7.83E-21 | 52 | 99 | No hit | No description |
| Gene3D | G3DSA:3.30.730.10 | 2.3E-17 | 55 | 99 | IPR001471 | AP2/ERF domain |
| Pfam | PF00847 | 1.0E-5 | 60 | 89 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 200 aa Download sequence Send to blast |
MDVVFQYSDS QSDLGIPIRR ASSSDDEVML ASRNPKKRAG RKKFRETRHP VYRGIRMRNS 60 GNSRIWLGTF PTAEMAARAH DVAAIALRGR SACLNFADSS WRLPAPASAS PKDIQKAAAE 120 AAEAFRPVET GEVGGGWEEG AAGDKTTSEE VFYMDEEAVF GMPGLLANMA EAMLLPSPNG 180 WGQEDVEVDA DVSLWNFSI* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcriptional activator that binds specifically to the DNA sequence 5'-[AG]CCGAC-3'. Binding to the C-repeat/DRE element mediates abscisic acid- and dehydration-inducible transcription. CBF/DREB1 factors play a key role in freezing tolerance and cold acclimation. {ECO:0000269|PubMed:11798174, ECO:0000269|PubMed:12376631}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_20.67 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: By high-salt stress, drought stress and abscisic acid (ABA) treatment. {ECO:0000269|PubMed:11798174, ECO:0000269|PubMed:12376631}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021903812.1 | 1e-120 | LOW QUALITY PROTEIN: dehydration-responsive element-binding protein 1D-like | ||||
| Swissprot | Q9FJ93 | 9e-66 | DRE1D_ARATH; Dehydration-responsive element-binding protein 1D | ||||
| TrEMBL | A0A1I9RH41 | 4e-97 | A0A1I9RH41_CARPA; C-repeat/dehydration-responsive element-binding factor 1A | ||||
| STRING | evm.model.supercontig_20.67 | 1e-144 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM355 | 28 | 187 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G51990.1 | 1e-62 | C-repeat-binding factor 4 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_20.67 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




