![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_2070.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 354aa MW: 39526.6 Da PI: 5.8443 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 12 | 0.00065 | 4 | 26 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
+kC C ksFs+ L H+r+H
evm.model.supercontig_2070.1 4 HKCRLCFKSFSNGRALGGHMRSH 26
79********************9 PP
| |||||||
| 2 | zf-C2H2 | 13.4 | 0.00024 | 232 | 254 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
ykC+ C+k+F++ L H +H
evm.model.supercontig_2070.1 232 YKCETCKKVFKSYQALGGHRASH 254
9************9999998887 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF13912 | 1.2E-5 | 3 | 27 | IPR007087 | Zinc finger, C2H2 |
| SuperFamily | SSF57667 | 4.33E-8 | 3 | 26 | No hit | No description |
| SMART | SM00355 | 0.065 | 4 | 26 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE profile | PS50157 | 10.596 | 4 | 31 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 6 | 26 | IPR007087 | Zinc finger, C2H2 |
| SuperFamily | SSF57667 | 4.33E-8 | 227 | 254 | No hit | No description |
| Pfam | PF13912 | 6.7E-11 | 232 | 256 | IPR007087 | Zinc finger, C2H2 |
| PROSITE profile | PS50157 | 10.866 | 232 | 259 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 0.023 | 232 | 254 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE pattern | PS00028 | 0 | 234 | 254 | IPR007087 | Zinc finger, C2H2 |
| PROSITE profile | PS50157 | 9.058 | 283 | 305 | IPR007087 | Zinc finger, C2H2 |
| Pfam | PF13912 | 6.7E-11 | 283 | 305 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 0.43 | 283 | 305 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE pattern | PS00028 | 0 | 285 | 305 | IPR007087 | Zinc finger, C2H2 |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0044212 | Molecular Function | transcription regulatory region DNA binding | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 354 aa Download sequence Send to blast |
MERHKCRLCF KSFSNGRALG GHMRSHMLNL PIPPKPQVEV EEQVKEEEEE DVNQVSEDAE 60 SASSSSSSSE EEEGGEEKGQ FYGLRENPKR SIRLGDPEFS FAAVDAGSVI LQDRESETES 120 SKNPTRRRSK RTGKSEHHHR RFEENAKKFK SNPPSATKSE SWAEPEPVSS ISGTTTEEDV 180 AFCLMMLSRD NKWKNRVEED EDQQRGEAEK SMEETDESYG FKSIKTPNRG KYKCETCKKV 240 FKSYQALGGH RASHKKNKQS NEPQMGQENA AGTCSSTAEK KIHECPVCLR IFSSGQALGG 300 HKRSHGVSLV ETPAKSCTSF IDLNLPAPID DEELSQIELS AVSDAEFVNQ MNR* |
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00416 | DAP | Transfer from AT3G60580 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_2070.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021889337.1 | 0.0 | zinc finger protein ZAT9-like isoform X1 | ||||
| Refseq | XP_021889347.1 | 0.0 | zinc finger protein ZAT9-like isoform X1 | ||||
| Refseq | XP_021889355.1 | 0.0 | zinc finger protein ZAT9-like isoform X1 | ||||
| TrEMBL | A0A2C9WPI6 | 1e-140 | A0A2C9WPI6_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_2070.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1465 | 28 | 93 | Representative plant | OGRP2404 | 10 | 30 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G45120.1 | 2e-64 | C2H2-like zinc finger protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_2070.1 |




