![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_21.168 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 427aa MW: 49150.7 Da PI: 7.2531 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 15.6 | 4.7e-05 | 169 | 192 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHH.T CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirt.H 23
y+C+ Cg+ ++++ +Lk+H r H
evm.model.supercontig_21.168 169 YVCGVCGRKCKTSLDLKKHFRQlH 192
9******************99877 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:3.40.50.1010 | 1.3E-6 | 89 | 159 | IPR029060 | PIN domain-like |
| SuperFamily | SSF57667 | 4.82E-5 | 162 | 200 | No hit | No description |
| SMART | SM00355 | 0.0073 | 169 | 192 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE profile | PS50157 | 11.011 | 169 | 197 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 171 | 192 | IPR007087 | Zinc finger, C2H2 |
| CDD | cd06167 | 4.20E-12 | 183 | 323 | No hit | No description |
| Gene3D | G3DSA:3.40.50.1010 | 1.3E-6 | 254 | 320 | IPR029060 | PIN domain-like |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 427 aa Download sequence Send to blast |
MSSLCNSLDT LPLKPLSMHR TDLLFSRSPY LSFLAPSLNN HKLTITLRPP LTNPRVIYRP 60 CLIRSSSSSS ASTSDIDMVR NKEGIYTPNQ SKVVVLWDLD NKPPRGPPYE AAMALRQVAQ 120 RFGDIVEISA YANRHAFIHL PQWVLQERRE RKQLNILERK GVVTPSEPYV CGVCGRKCKT 180 SLDLKKHFRQ LHERERQKKF NRMRSLKGKK RQKYKEKYIT GNHKYNEAAR SLITPKVGYG 240 LASELRRAGV FVKTVEDKPQ AADWALKRQM QHSMTRGIDW LFLVSDDKDF VEMLRKARDA 300 NLGTVVVGDW DRALGRHADL WVPWVEVENG GLTEKDLMPE KRRRQDLEEE GVLFSVSCFD 360 GERDLDRVVD ELVVQRTEFG GARISAFSEG EEDDDDEWVT EEDWDNEDYL LRASEDEITE 420 GEDGYF* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_21.168 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021903420.1 | 0.0 | uncharacterized protein LOC110818755 | ||||
| Refseq | XP_021903421.1 | 0.0 | uncharacterized protein LOC110818755 | ||||
| Refseq | XP_021903423.1 | 0.0 | uncharacterized protein LOC110818755 | ||||
| Refseq | XP_021903424.1 | 0.0 | uncharacterized protein LOC110818755 | ||||
| TrEMBL | A0A067GWV6 | 0.0 | A0A067GWV6_CITSI; Uncharacterized protein | ||||
| TrEMBL | V4V788 | 0.0 | V4V788_9ROSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_21.168 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM12584 | 24 | 29 | Representative plant | OGRP3048 | 14 | 20 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G52010.1 | 1e-161 | C2H2-like zinc finger protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_21.168 |




