![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_216.26 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 151aa MW: 16842.3 Da PI: 10.9816 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 18.4 | 6.1e-06 | 82 | 104 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
+ C++C+k F r nL+ H r H
evm.model.supercontig_216.26 82 FICEICNKGFQRDQNLQLHRRGH 104
89*******************88 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF57667 | 1.75E-5 | 80 | 105 | No hit | No description |
| Gene3D | G3DSA:3.30.160.60 | 2.6E-6 | 81 | 104 | IPR013087 | Zinc finger C2H2-type/integrase DNA-binding domain |
| Pfam | PF12171 | 1.2E-5 | 82 | 104 | IPR022755 | Zinc finger, double-stranded RNA binding |
| PROSITE profile | PS50157 | 10.845 | 82 | 104 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 84 | 104 | IPR007087 | Zinc finger, C2H2 |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003676 | Molecular Function | nucleic acid binding | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 151 aa Download sequence Send to blast |
MMHQNHVHGL SVSSTVKGFV PPPPHRHQQT ATSNPNPNPN PNNNPSANPA ANKKKRNLPG 60 TPDPDAEVIA LSPKSLMATN RFICEICNKG FQRDQNLQLH RRGHNLPWKL RQRTNKEVVR 120 KKVYICPEKS CVHHDPSRAL GDLTGIKKHL * |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 108 | 121 | KLRQRTNKEVVRKK |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor that acts as a positive regulator of gibberellin (GA) action, homeostasis and signaling. GA converts the GAF1 complex from transcriptional activator to repressor via the degradation of DELLA proteins. {ECO:0000269|PubMed:25035403}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_216.26 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021887023.1 | 1e-105 | LOW QUALITY PROTEIN: protein indeterminate-domain 9 | ||||
| Swissprot | Q9SCQ6 | 2e-60 | IDD2_ARATH; Zinc finger protein GAI-ASSOCIATED FACTOR 1 | ||||
| TrEMBL | A0A059ABD4 | 2e-67 | A0A059ABD4_EUCGR; Uncharacterized protein | ||||
| TrEMBL | A0A3N6U000 | 1e-67 | A0A3N6U000_BRACR; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_216.26 | 1e-107 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Representative plant | OGRP95 | 16 | 242 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G45260.1 | 1e-61 | C2H2-like zinc finger protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_216.26 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




